这一计划是意大利有史以来最大的公共工程项目。
That plan has become Italy's biggest public works project ever.
有无数的方法和工具可以用来支持这些活动,并且传统的工程项目拥有一个行之有效的、或多或少按计划完成的记录。
There are numerous methods and tools available for supporting these activities, and traditional engineering projects have a proven track record in completing their work more or less as planned.
据英国卫报在其网站报道,这个试验性的地球工程项目号称为“世界上最大的造冰实验”。该项目计划在本月底启动。
The trial geoengineering project, dubbed one of the "world's biggest ice-making experiments," is scheduled to begin later this month, the Guardian newspaper reported on its website.
有许多关键的不同点使得软件项目较之传统的工程项目更加难以制订计划、进行评估、依照计划顺利完成。
There are key differences that make software projects much more difficult to plan, estimate, and complete according to plan than traditional engineering projects.
他在世界范围内的制药工程项目上有超过15年的广泛的项目计划和执行经验。
He has more than 15 years experience in the planning and implementation of a very wide range of pharmaceutical projects world-wide.
网络计划进度优化是工程项目管理的关键性问题之一。
Network planning schedule optimization is one of the pivotal issues in engineering project management.
监督人员通过对施工单位和工程项目的了解,在监督计划中应明确监督工作的具体方法、方式、手段和措施。
Through the understanding of construction units and engineering projects, supervisors should make clear the specific methods, way, means and measures of supervision work in the supervision plan.
初步介绍了网络计划技术的基本原理,并探讨了其在化工设备制作工程项目管理中的应用。
This paper briefly introduces the fundamental principle of network planning technology and discusses its application in the project management of chemical equipment production.
做好各类计划的编制和实施,是保证工程项目按照总体开发方案所确定的预算和时间目标完成的关键一环。
The key to ensure the project meeting the budget and timing as determined by ODP is to have good planning and execution of various plans.
强化工程项目的预算计划控制,全面提高项目管理的水平。
Enhancing the budget plan controls in engineering project, increasing completely the projects management level.
从大物流工程项目类制造企业管理的角度,提出了基于企业生产计划的物流调度模型。
As viewed from the management of enterprise with large material flow engineering project, a scheduling model is presented based on the enterprise production plan.
甘特图是工程项目进行工期计划和控制的有效工具。
Gantt chart is an effective tool for planning and controlling project schedule.
指出该方法也适用于其它各类工作、工程项目以及对工矿企业实施优化的计划管理。
The method can also be adopted in other areas and various engineering projects as well as the optimal plan management of industrial enterprises.
根据公路工程的特点,将公路工程项目进行工序分解,利用网络计划图将其连接成一个整体。
On the basis of highway project characters, this research links all working procedure of a highway project together by network planning.
研究了软件工程项目计划管理、项目进度管理、成本控制技术在中小软件开发企业中如何应用。
How to apply plan management, process management, control of cost of software engineering are studied in the middle and small software development enterprises.
项目信息是航天工程项目计划与控制的基础。
The information is the foundation of projects'planning and controlling.
网络计划技术是工程项目计划管理的有效方法,也是管理系统工程中的一种主要的现代管理技术。
Network planning project is an effective way to plan project management technology. Also is an important modern management techniques for management of systems engineering.
计划与进度控制、成本控制、质量控制和安全控制是工程项目管理的重要组成部分。
Plan and schedule control, cost control, quality control and safety control are important parts of project management.
现金流预测对核电工程项目业主和承包商安排资金计划和降低资金成本具有重要意义。
Cash flow forecasting is very important for owners and contractors of nuclear power projects to arrange the capital and to decrease the capital cost.
本文阐述工程项目施工进度监理工作中监理计划的制定及如何有效地利用监理计划对施工进度进行监测、调整。
This paper sets forth that how the plan of progress supervision is prepared and how it is used to supervise and update the progress in the respect of supervising the progress.
目前,工程项目进度计划的编制多采用网络计划方法。
Project network technique is presently a frequently-used method to make project schedule plan.
本文提出将项目目标体系化,以阶段进度计划为项目产品,结合ARIS理论对工程项目管理进行建模分析。
This paper proposes system of project objectives will be to progress plans for the project stage products. ARIS with the theory of project management modeling analysis.
该模型实现了对工程项目成本的动态管理,使企业能够实现工程项目成本计划目标值。
So, it can realize the achieve dynamic management of engineering projects cost and assure that enterprise realize target value of engineering project cost.
配合项目经理和产品设计工程师,计划,管控和追踪工程项目。
Co-operate with project managers and product design engineers to plan, control and track the engineering projects.
建筑工程项目的启动需要经过项目立项、可行性研究、设计、项目计划等阶段。
To start up a construction engineering project should pass through these stages: project establishing, feasibility research, designing, project planning and etc.
光纤信道切换光纤信道切换是又一个例子。设计人员选择fpga来实现某个光纤信道切换的工程项目,这是因为其ASIC计划无法在一个合理的时间内实现。
Fiber Channel switch in another example, a designer chose an FPGA for a Fiber Channel switching project, because his ASIC plans couldn't be realized in a reasonable time frame.
指出在复杂大系统工程项目计划中,利用网络计划技术进行动态优化管理与决策是工程项目计划管理与决策的一种有效途径。
And it is considered a effective approach to apply dynamic optimization management and decision with network schedule technique in complex large system project schedule.
指出在复杂大系统工程项目计划中,利用网络计划技术进行动态优化管理与决策是工程项目计划管理与决策的一种有效途径。
And it is considered a effective approach to apply dynamic optimization management and decision with network schedule technique in complex large system project schedule.
应用推荐