• 计划进度合同强制性要求

    Planning and Scheduling, as defined herein, will be a mandatory requirement of this Contract.

    youdao

  • 承包商程序纳入计划进度程序中。

    Contractor will incorporate this procedure into its Planning and Scheduling procedure (s).

    youdao

  • 项目执行过程中,根据要求承包商业主提供所有相关计划进度资料

    Upon request, Contractor will provide the Owner with access to all relevant planning and scheduling documents throughout the duration of the project.

    youdao

  • 计划进度控制成本控制、质量控制安全控制工程项目管理重要组成部分

    Plan and schedule control, cost control, quality control and safety control are important parts of project management.

    youdao

  • 有效组建项目组推动项目品质质量完成目标有效控制计划进度

    Can effectively set up the project team, and promote the quality of projects, quality and objective, the effective control of plans and progress;

    youdao

  • 程序是对CHRP-PC-PP-0001对承包商项目控制要求程序中的计划进度进一步定义补充

    This procedure further defines and supplements the Planning and Scheduling requirements found in Procedure No. CHRP-PC-PP-0001, Project Controls Requirements for Contractors.

    youdao

  • 同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解

    Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    youdao

  • 同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解

    Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc. in this paper.

    youdao

  • 按照风险影响——如果风险突然出现,计划进度工作量成本的偏离。

    By the impact of the risk — the deviations of schedule, effort, or cost from plan if the risk materializes.

    youdao

  • 管理这个项目计划中,项目经理必须这个项目技术领导者一起合作评估工作完成进度

    In managing the project plan, the project manager must work with the technical leads of the project to assign work, and to assess work completion.

    youdao

  • 制定计划后,需要一种方法针对计划监控进展,即检查实际进度日期是否计划一致

    Once a plan is developed, you need a way to monitor progress against the plan. That is, to check whether the actual progress to date corresponds with the plan.

    youdao

  • 可以调查趋势学习如何计划的时规划实际比较应该能够改进您的项目计划时间进度安排。

    You can examine trends, and should be able to improve your project planning and scheduling as you learn how your projected timeframes compare to actuals.

    youdao

  • 1包含MSproject进度输出的两项目计划共同构成文档文件

    The use cases shown in Table 1, along with a two-page project plan that includes an MS Project Schedule export, constitute the documentation.

    youdao

  • 网络计划技术施工项目管理行之有效的一种管理方法,进度计划管理中得到了广泛推广应用

    Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.

    youdao

  • 网络计划方法进度计划控制基本方法。

    Network planing is a kind of basic method for degree of progress plan and control.

    youdao

  • 不过忘了现场特殊条件工厂有关进度计划应该标书合同以及合同条件包括进去。

    But don't forget the site particulars and schedules relating to the plant. You should also include the bidding and contractual documents and the conditions of those contracts.

    youdao

  • 讨论项目进度计划冲突资源相关关键任务、关键任务以及关键任务提出统一定量表示方法

    This paper discussed the critical task, critical task set and critical task group involved conflict resource in a project scheduling scheme, and put forward a unified quantitative express method.

    youdao

  • 实际进度进行动态跟踪后发现实际进度计划进度出现差异如何进行有效快速调整监理工程师来说不是一个容易问题

    How to carry on valid and fast adjustment when difference appears between actual progress and former plan progress, to supervisory engineers, it is not an easy problem.

    youdao

  • 领导协调开店团队其他部门使开店紧跟进度来走,根据蓝图计划。使开店任务更好更简单更便宜

    Lead and coordinate New store opening team and other departments, to ensure that store opening progress is on schedule and plan by blueprint, to deliver better, simpler and cheaper task to store.

    youdao

  • 文章详细阐述了法进行费用进度综合分析控制,对已完工作预算费用、计划工作预算费用已完工作实际费用的分析控制。

    This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.

    youdao

  • 摘要介绍ap1000三门项目首次送电整体进度控制过程针对现场执行过程中执行计划基准计划偏差进行分析

    ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.

    youdao

  • 通过分析专业实际进度专业计划进度差距结合实际找到适合项目特点进度控制方法

    By analyzing the difference of the actual schedule and plan, combined to the actual cases, found the schedule control methods which fit for the characteristics of this project.

    youdao

  • 原定进度计划实际进度承包商义务相符时,承包商提交份修订进度计划

    The Contractor shall also submit a revised programme whenever the previous programme is inconsistent with actual progress or with the Contractor's obligations.

    youdao

  • 根据生产计划,生产任务单进行物料需求MRP运算采购进度的跟进协调;

    Based on production planning and relevant WOs to determine according material requirement plans through calculation by running MRP module of ERP.

    youdao

  • 提出核工程质量进度集成控制网络计划技术及其网络图模型,介绍了该网络计划的编制和使用方法。

    The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.

    youdao

  • 提出结合柔性网络计划技术进度分析优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

  • 提出结合柔性网络计划技术进度分析优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;