根据计划3套Oyster2 装置将在2011年夏天部署在欧洲海洋能研究中心(EMEC),这三个设备将同一个2.4MW的岸上水利发电机组相连接,据估计20个Oyster2机组可以满足1.2万个家庭的电能需求。
Plans to deploy three Oyster 2s at the European Marine Energy Centre (EMEC) in Orkney in summer 2011. All three devices will be linked to a single onshore 2.4MW hydro-electric turbine.
生产线机组主要包括机械设备、前处理设备、涂敷设备、烘干设备、辅助系统和电控装置等。
Its equipments of the production line mainly comprise: machine equipments, pretreatment equipments, coating equipments, drying equipments, assistant equipments and electric control.
烟气轮机组是催化裂化装置重要的节能设备,也是关键机组。
Flue gas turbine-expander set is important energy-saving equipment and also a critical set in the catalytic cracking unit.
生产设备由熔喷铺网装置、热熔材料输入装置、机织物退绕装置、热轧机和卷绕机组成。
A production device consists of a melt-brown mesh paving device, a hot-melt material input device, a woven fabric unwinding device, a hot rolling machine and a coiling machine.
生产线机组主要包括机械设备、前处理设备、涂敷设备、烘干设备、辅助系统和电控装置等。
Its equipments of the production line mainly comprise: machine equipments, pretreatment equipments, coating equipments, drying equipments, assistant equipments and electric control. etc.
生产线机组主要包括机械设备、前处理设备、涂敷设备、烘干设备、辅助系统和电控装置等。
Its equipments of the production line mainly comprise: machine equipments, pretreatment equipments, coating equipments, drying equipments, assistant equipments and electric control. etc.
应用推荐