• 复合载体施工过程中,一定控制速度以免出现缩颈现象

    For the ram compaction piles with composite bearing base, the speed of drawing pipe must be controlled, so as to avoid the gapping or the cut-off.

    youdao

  • 复合载体施工过程中,一定控制速度以免出现缩颈现象

    For the ram compaction piles with composite bearing base, the speed of drawing pipe must be controlled, so as to avoid the gapping or the cut-off.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定