• 通过岩矿强度自然破断试验研究,找到降低磨机钢球尺寸理论依据。

    Theoretical reason of reducing ball size of coarse grinding has been found through tests on compressive strength of rock and rupture stress of natural ore lump.

    youdao

  • 通过井下实例进行锚杆预紧控制试验,锚杆破断现象基本消失取得很好的支护效果

    With the underground mine cases, a test of the bolt pre-tension control was conducted and the bolt broken phenomenon was basically eliminated with excellent effect.

    youdao

  • 通过井下实例进行锚杆预紧控制试验,锚杆破断现象基本消失取得很好的支护效果

    With the underground mine cases, a test of the bolt pre-tension control was conducted and the bolt broken phenomenon was basically eliminated with excellent effect.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定