缩短堆浸周期,有利于提高堆浸厂的产量、经济效益和矿堆浸出率。
Shortening the heap leaching cycle period is conducive to the raising of the heap leaching rate so the output of the factory will be raised and better economic benefit obtained.
在地下溶浸采矿中,为了改善受浸矿堆的渗透性,加快浸出速度,提高浸出效果,需将矿岩爆破至一定的块度。
When in underground mine leaching, in order to improve permeability of heap leaching, speed up leaching and improve leaching effectiveness, ore should be blasted to certain fragmentation.
根据试验结果,认为洗矿—矿砂堆浸—矿泥搅拌浸出是处理玉龙铜矿氧化带矿石的合理工艺。
According to the tests results, it is concluded that the process of washing-sand leaching-stirring leaching is reasonable for the oxide copper ore of Yulong copper mine.
从矿堆浸润率与矿体(矿堆)产状的关系人手,结合原地爆破浸出实践,对原地爆破浸出工艺的布液方法进行了论述。
From the relation between ore pile soakage rate and occurrence, on the basis of practice of stope leaching, the methods of lixiviant distribution for stope leaching are described in this paper.
试验结果表明,制粒—氰化预处理—堆浸可改善含粘土质矿的渗透性、提高金的浸出率、加强浸出速度、缩短浸出周期、降低成本及改善环境条件。
The results show that this new process can enhance the gold leaching rate from the clay-containing ore, increase the leaching speed, shorten operational cycle, cut production costs and…
试验结果表明,制粒—氰化预处理—堆浸可改善含粘土质矿的渗透性、提高金的浸出率、加强浸出速度、缩短浸出周期、降低成本及改善环境条件。
The results show that this new process can enhance the gold leaching rate from the clay-containing ore, increase the leaching speed, shorten operational cycle, cut production costs and…
应用推荐