• 实施生产测试计划”,确保符合所有标准达到高度保证符合性”;

    Implement a "Production Testing Plan" that assures a "high degree of assurance" that all standards will be met;

    youdao

  • 测试获得了一个不同生产中的访问计划

    You get a different access plan in test than production.

    youdao

  • 如何接手生产环境测试环境中重新创建相同查询访问计划呢?

    How do I recreate the same query access plan on my test environment that I am getting on my production environment?

    youdao

  • 测试完成使商业宽带卫星计划(CBSP)的单位级别转换(ulv)进入初期生产阶段

    Completion of the testing moves the Commercial Broadband Satellite Program (CBSP) Unit Level Variant (ULV) contract into the initial production phase.

    youdao

  • 迁移生产队列管理器之前要测试计划创建文档

    Document and test the plan before migrating production queue managers.

    youdao

  • 苹果可能计划富士康一月完成iPad2制作,但是大批量生产将会完成系统固件测试之后。

    Apple supposedly planned to have Foxconn start cranking out iPad 2s in January, but has pushed back mass production while it finishes testing the system's firmware.

    youdao

  • 计划阶段熟悉LotusSametimeV7.5功能增强功能,这样可以确定测试最终部署生产中的内容。

    In the planning stage, you familiarize yourself with the new and enhanced features of Lotus Sametime V7.5 so that you can determine what you want to test and ultimately deploy into production.

    youdao

  • 报道苹果公司最初计划2011年1月开始大规模生产iPad 2,由于设备测试推迟计划

    The piece said that Apple had originally planned mass production in January, but that the schedule has been pushed back due to testing for the device’s firmware.

    youdao

  • 但是请注意如果需要测试结果访问计划执行仍然需要尽可能多数据生产环境装入测试环境。

    Note, however, that if you want to test the execution of the resulting access plan, you will still need to load data from production onto test (as much data as possible).

    youdao

  • 开始迁移生产运行之前应该确保您的运行时迁移计划已经实验环境中进行了测试

    Be sure to test your run time migration plans in a test environment before starting the migration of your production run time.

    youdao

  • 无论测试生产计划环境是否一致总是会在迁移生产集群队列管理器发现问题

    Whether or not the plans and environments for test and production differ, it is always possible to find problems when migrating the production cluster queue managers.

    youdao

  • 百事公司周二宣布了这个发现宣布公司计划在2012年会少量生产几十万进行测试

    PepsiCo announced the discovery Tuesday and said it plans to test the product in 2012 in a few hundred thousand bottles.

    youdao

  • 开始移植生产运行以前,先测试环境下测试您的运行时移植计划

    Test your run time migration plans in a test environment before starting the migration of your production run time. Migration is more than just installing new products.

    youdao

  • 理想情况下测试环境使用迁移计划应该生产环境中使用的迁移计划一样,以便测试最大限度地发现潜在问题不是将那些潜在问题留在生产环境中。

    Ideally, an identical migration plan is executed in both test and production to maximise the chance of finding potential problems in test rather than in production.

    youdao

  • 步骤4使用db2exfmt测试生产获得访问计划确保下列内容与生产中的相同

    Step 4: Get the access plan using db2exfmt from both test and production, and make sure that the following is the same as it is in production.

    youdao

  • 以达到产品质量计划产量完成情况批量生产工装设备机械条件来作测试(包括操作人员)。

    Both the product quality achieved and achievement of the planned quantities are checked using volume production tooling, equipment, facilities and conditions (including operating personnel).

    youdao

  • 供应商检验测试计划批量生产开始至少30提交B认可

    The SUPPLIER shall prepare an Inspection and Test Plan (ITP) and submit it to B for approval no less than 30 days before start of serial production.

    youdao

  • 今年计划进行人体临床实验测试禽流感病毒的效果,使用该方法大规模生产产品有好几的时间。

    Human clinical trials are planned for this year to test it against the bird flu, but any mass-produced product is still several years away.

    youdao

  • 指定生产计划按照客户要求配合质量部准备测试计划

    To draw up production plans and customer requirements in accordance with the Quality Department to prepare the test plan;

    youdao

  • 提供数据象限工程塑料制品形状股票象限资源增值计划生产零件测试

    Data provided by Quadrant Engineering Plastic Products from tests on stock shapes and parts produced by Quadrant EPP.

    youdao

  • 负责生产测试开发项目成本、时间计划指标,以及测试覆盖率、测试通过率测试时间指标。

    Committing project cost and time-plan targets, as well as test-coverage, test-yield and test-time targets, within the PTD projects.

    youdao

  • 负责生产测试开发项目成本、时间计划指标,以及测试覆盖率、测试通过率测试时间指标。

    Committing project cost and time-plan targets, as well as test-coverage, test-yield and test-time targets, within the PTD projects.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定