从航运公司的角度评价与班轮船期表有关的时间因素的协调措施,分析船期不可靠性的原因,并广泛讨论班轮公司用来增强船期可靠性的一系列措施和工具。
The causes of schedule unreliability were assessed as well, and the wide array of measures and planning tools shipping lines deploy to maximise schedule reliability were discussed.
从航运公司的角度评价与班轮船期表有关的时间因素的协调措施,分析船期不可靠性的原因,并广泛讨论班轮公司用来增强船期可靠性的一系列措施和工具。
The causes of schedule unreliability were assessed as well, and the wide array of measures and planning tools shipping lines deploy to maximise schedule reliability were discussed.
应用推荐