根据滚动生产计划,在SAP 系统中管理和制定物料计划。
Work out material requirement plan in SAP based on rolling production plan.
根据生产计划分配物料和资源;
根据新产品的生产计划和新产品项目领导人的指示及时发放物料到生产线。
Release all parts to cell in time according NPD schedule and NPI Project leader's instruction.
确保所有供应的物料能够满足生产计划的需求。
Ensures all material requirements are sufficient for production schedules.
负责日常生产,根据生产计划控制过程,优化物料和生产流程确保稳定生产以满足客户要求。
Responsible for daily production, make up production schedule, optimize material, working flow to ensure stable production to meet customer requirements.
负责相关工作的监督和执行,如:工艺设计、数控编程、车间生产计划、产能计划和物料管理。
Responsible for supervision and execution of related areas such as manufacturing engineering, CNC programming, Shop Floor Scheduling, Capacity Planning and Material Organization.
协助主管对生产计划的制定、跟进及物料的跟踪和扣除库存。
To make a inventory for all materials before store, familiar with overall operation flow of store and material control.
文章介绍了一个基于B/S模式的小型ERP系统的设计,系统包含了库存管理、物料需求计划、销售计划、主生产计划、采购计划等核心功能模块。
The paper introduces the design of a small ERP based on B/S mode. The system includes stock, material requirement, selling, planning, and purchasing module of ERP.
与采购部门沟通协调,保障生产用料,生产工具,设备的供应和准备按照生产计划进行,催急现场缺少的物料.。
Cooperation with purchasing department, to make sure the production material, tools, equipment are supplied and prepared according to the production planning, push the missing component in production.
按生产计划跟踪生产进度和控制物料,如果在线出现异常需及时反馈给计划员,以便重新调整计划。
Following up the production progress and control material according to production plan by LGC. Leader will feedback to planner in time if any unusual question in line so as to readjust the plan.
负责生产物料和日常耗材的采购,确保物料和产能的平衡,实时跟踪主生产计划的执行情况,进行必要的调整。
Prepare production materials and general supplies. Ensure the balance of materials and capacity. Follow up the status of MPS and does adjustment for necessary changes.
根据生产计划,生产任务单进行物料需求MRP的运算与采购进度的跟进协调;
Based on production planning and relevant WOs to determine according material requirement plans through calculation by running MRP module of ERP.
根据生产计划,生产任务单进行物料需求MRP的运算与采购进度的跟进协调;
Based on production planning and relevant WOs to determine according material requirement plans through calculation by running MRP module of ERP.
应用推荐