介绍了沉管灌注筒桩的成桩设备、施工工艺和承载力计算公式。
This paper introduces a new type of driventube castinplace pile. Its construction equipment, construction process and bearing capacity were studied.
介绍了杭-宁高速公路长兴段沉管灌注筒桩(简称筒桩)处理高速公路桥头车的试验研究。
This paper introduces the experimental results of driven cast-in-place tubular pile applied to treatment of bridgehead jumping in Chang-Xing Section of Hang-Ning Highway.
介绍了杭-宁高速公路长兴段沉管灌注筒桩(简称筒桩)处理高速公路桥头车的试验研究。
This paper introduces the experimental results of driven cast-in-place tubular pile applied to treatment of bridgehead jumping in Chang-Xing Section of Hang-Ning Highway.
应用推荐