• 但是安装海上风力发电机一个缺点就是项目成本相对较高原因严峻现场条件特殊环境所致的不易接近性。

    However, a drawback of installing wind turbines offshore is the slightly higher project costs, caused primarily by the more challenging site conditions and limited accessibility.

    youdao

  • 但是安装海上风力发电机一个缺点就是项目成本相对较高原因严峻现场条件特殊环境所致的不易接近性。

    However, a drawback of installing wind turbines offshore is the slightly higher project costs, caused primarily by the more challenging site conditions and limited accessibility.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定