但是,安装海上风力发电机的一个缺点就是项目成本相对较高,原因是更严峻的现场条件和特殊环境所致的不易接近性。
However, a drawback of installing wind turbines offshore is the slightly higher project costs, caused primarily by the more challenging site conditions and limited accessibility.
但是,安装海上风力发电机的一个缺点就是项目成本相对较高,原因是更严峻的现场条件和特殊环境所致的不易接近性。
However, a drawback of installing wind turbines offshore is the slightly higher project costs, caused primarily by the more challenging site conditions and limited accessibility.
应用推荐