• 起初是一个连接钱塘海湾慢慢出口的淤泥被转变成了内陆湖

    Originally a shallow bay adjoining the Qiantang River was gradually transformed into an inland lake by the silting-up of the outlet.

    youdao

  • 全州县鹞子电站引水枢纽设计根据不同条件,采取沉沙槽、工程措施来解决渠道淤积问题。

    According to different conditions, the Yaozijiang hydropower station diversion pivot designing USES engineering countermeasure, such as desanding trap, desilting sluice, etc.

    youdao

  • 本文介绍新安电站溢流坝面环氧砂浆涂层老化状况研究

    This paper introduce the research on aging effects of the Xinanjiang hydropower station.

    youdao

  • 金沙溪洛渡水电站巨型水电站,发育一推覆构造——马家河坝断层

    The Xiluodu Hydropower Station on the Jinsha River is a giant hydropower station, but a thrust nappe structure-Majiahe Dam fault-lies in the reservoir head region.

    youdao

  • 本文通过多种方法对冈底斯成矿带驱龙、厅宫、铜矿进行同位素定年研究,确定冈底斯斑岩铜矿成岩年龄1 7。

    Several methods have been used for the isotopic dating of the Qulong, Tingong and Chongjing porphyry copper deposits, which gives out a diagenetic age of 17.

    youdao

  • 本文通过多种方法对冈底斯成矿带驱龙、厅宫、铜矿进行同位素定年研究,确定冈底斯斑岩铜矿成岩年龄1 7。

    Several methods have been used for the isotopic dating of the Qulong, Tingong and Chongjing porphyry copper deposits, which gives out a diagenetic age of 17.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定