南梁岩体主要由斑状花岗岩、流纹斑岩、花斑岩及流纹质角砾熔岩组成。
Nanliang complex is mainly composed of porphyritic granite, granophyre, rhyolite - porphyry and rhyolitic agmatite-lava.
岩锚吊车梁在施工及运行期的工作性态和稳定性是工程设计和施工中所关注的主要问题之一。
The working performance and stability of the rock bolt crane girder has always being an important problem in project design and construction.
平衡岩梁的变形对支架产生的影响受直接顶的岩性和其损伤后的强度的影响是明显的。
It is remarkable that the residual strength of damaged immediate rock influence on the load of support influenced by balance rock layer.
通过某市友谊大道滑坡工程实例,介绍锚索格构梁在岩质滑坡治理中的设计、施工方法及效果。
Anchor-cable lattice beam is introduced on its design, construction and application effect in treatment of rock landslide by field case.
在地下厂房开挖支护过程中,爆破震动控制直接影响到高边墙的稳定及岩锚梁结构安全。
The control of blasting vibration in the excavation of underground powerhouse is the key factor influencing the construction safety of underground powerhouse.
目前,岩壁吊车梁设计所采用的刚体极限平衡设计方法还不能确切反映岩锚吊车梁的实际受力状态。
At present, the rigid-body limit equilibrium method adopted in the design of crane beam on rock wall can not reflect the actual mechanical behavior of crane.
以关键层理论、传递岩梁理论以及采场上覆岩层及地表移动规律理论为基础,推导出岩梁抗弯刚度的误差补偿公式。
On the basis of key rock strata theory, transferring rock beam structure and the law of the overlying strata displacement and the surface subsidence theory, we deduced offset error formula.
江津观音岩长江大桥为结合梁桥,为防止桥面板湿接缝在约束条件下产生裂缝,该桥面板湿接缝要求采用微膨胀混凝土,以补偿混凝土的收缩、徐变。
In order to prevent the cracks that would be likely caused by restricted conditions of the wet-joint, the wet-joint demands using expansive concrete to compensate the shrinkage and creep.
地下厂房岩锚梁开挖难度大、质量要求高,该部位成型质量的好坏将直接影响今后厂房内吊车的运行安全。
Technology of excavating anchoring rock beam is the most difficult and demanded in excavating underground factory, its quality will affect its safety of performing later.
金厂沟梁金矿区中与成矿伴生的暗色脉岩主要是细晶闪长岩石英闪长岩、闪长玢岩英安斑岩类。
The dark dikes associated with mineralization in the Jinchanggouliang mine area, are mostly fine diorite-quartz diorites and diorite porphyrite-dacite porphyries.
将采场顶板简化为岩梁模型,岩梁的最大拉应力及其极限跨距是采矿工程涉及到的两个重要参数。
The roof in working areas is simplified as rock beam, the maximum tensile stress and limited span of rock beam are important in mining engineering.
并且可以通过对岩锚吊车梁预先施加锚固力的方式改变岩锚吊车梁的失稳形式。
The destabilizing pattern of rock-anchored crane beam can be changed via the pre-applied anchoring force to rock-anchored crane beam.
根据复合岩梁理论,推出了开采沉陷中层面滑移函数和层面滑移判断式。
Based on theory of composite rock beam, a function and a formula for stratification plane gliding was deducted.
对组合岩梁模型在岩层移动规律研究、地表沉陷控制以及在矿井瓦斯防治中的应用进行了深入地分析。
The applications of the composed rock beam model in ground control, surface subsidence control and gas prevention in coalmine are studied deeply.
岩锚吊车梁结构稳定计算所普遍采用的方法有刚体平衡法和有限单元法。
The methods of calculation for the structural stability of rock-bolted crane girder include the rigid equilibrium method and the finite element method.
五道梁群以灰白色、灰黄色灰岩为主,含有砾岩、砂岩,夹有少量泥岩、油页岩和未固结砂泥沉积。
Wudaoliang group is grayish - white, yellow - grey, dark - grey ash rock, which interbeded with the conglomerate, sandstone, a little amount mudstone, oil shale with unconsolidated sand mud rock.
根据岩石的全应力应变试验,结合现场实际观测数据,对以应变为指标的岩梁断裂步距表达式做了初步验证。
According to the total stress-strain tests, the expression of caving step length of roof is validated combining with the observed data.
研究结果表明,岩梁-矿柱系统的稳定性取决于系统自身的力学-几何特性,与外界因素无关。
The research results show that the stability of rock beam-pillar depends on the mechanical geometry characteristic of the system, and it has nothing to do with the external factors.
针对岩体变形破坏具有的突变性,结合材料力学理论,建立了岩梁-矿柱的尖点突变模型。
In view of the mutability in deformation and failure of the rock mass, and combined with the theory of the material mechanics, a cusp catastrophe model of rock beam-pillar was build.
组合岩梁模型的建立,为采场矿压和岩层移动的研究提供了一种新的思想和方法。
This model provides a unified idea and method for study of pressure in longwall mining and strata movement.
对陆梁油田白垩系及侏罗系储层成岩过程的研究表明,储层的孔隙演化主要与压实作用、溶蚀作用和胶结作用等有密切关系。
The study on the diagenesis course of Cretaceous and Jurassic reservoir in the Luliang oil field indicates that evolution of reservoir pores is closely related to compaction, solution and cementation.
本文通过工程实例探讨适合软岩边坡治理的格构梁的内力计算方法。
Internal force calculated method of lattice frame beam for projects was discussed for controlling soft rock slope.
鉴于此,研究了预应力锚索地梁中合理确定锚固角的方法,提出以锚索地梁和坡面岩体间不发生相对滑动为初判条件;
Therefore, some slopes cannot be reinforced efficiently by foundation beam with prestressed cable because of the unreasonable designed anchorage-angle.
本发明中粘贴玄武岩纤维布后的钢筋混凝土梁,其开裂荷载、屈服荷载和极限荷载均有提高。
In the invention, the cracking load, the yield load and the ultimate load of the reinforced concrete beam pasted with the basalt fiber fabrics are improved.
结果表明:岩梁的顶底两侧均存在流变,虽然其大致规律相似,但存在明显的差异。
It was shown that there were significantly different rheological deformations on top and bottom of rock beams with broadly similar regulation.
水电站地下厂房岩锚吊车梁是一种先进的结构形式 ,已在我国水电工程建设中发挥了重要作用 ,并且还将会发挥越来越重要的作用。
The rock bolt crane girder is an advanced structure which has played and will play continuously important roles in the construction of hydropower plant in China.
根据岩梁周期裂断步距与周期来压步距的力学结构,建立了各自的力学模型,推导其运动方程。
According to structural mechanics of cyclic fracturing length and the cyclic weighting interval for the rock beam fracture, Mechanical models and the motion equation are established.
介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.
分析结果表明:该滑坡岩体破坏的具体形式为岩梁弯曲折断,其中复杂的地质构造及较发育的地下水是产生该滑坡的主要因素;
The analysis results indicate that Mouzhudong landslide is a typical failure of rock beam bend. The complex geologic condition and enough groundwater are major factors.
目前,在我国建筑行业,屋面的保温层、上翻梁填充等采用的还是膨胀珍珠岩、陶粒、加气混凝土砌块、炉渣等。
At present, China's construction industry, roof insulation, turn on the beam used in filling or expanded perlite, etc., ceramic, aerated concrete block, cinder and so on.
应用推荐