作业时间测定是制定标准作业时间的重要途径之一。
Operation time measurement is one of the important ways to give standard operation time.
根据从现场获得的数据,应用MOD法确定了各动作的标准作业时间。
With the dada collected from the production line, MOD method is used to determine the standard operational time for each activity.
并以某企业的微型电泵装配为例,在分析其结构和装配工艺流程的基础上,得出其装配的标准作业时间。
Take the assembly of micro electric pump in a corporation in Zhejiang as example, the standardized time is presented based on the analyses of its structure and assembly process.
在分析装配线规划内容的基础之上,提出了基于标准作业时间及系统仿真的装配线规划方法并开发了相应的原型系统。
Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.
我对这资料做的第一件事是计算十二个作业中的每一个所花费的时间的平均值、最小值、极大值和标准差。
The first thing I did with this data was to calculate the average, minimum, maximum, and standard deviation of hours spent on each of twelve assignments.
通过标准化作业时间和产线平衡,提升生产能力。
To identity the productivity improvement opportunities by standardizing the process cycle time for each station and line balance.
在轿车总装流水线条件下,根据作业性质将标准工时划分为增值时间与非增值时间。
Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.
通过对钻孔加工族的时间研究,初步建立不同工步单件加工时间的标准资料,并探讨节省作业转换时间的方法。
By studying some boring machining families, standard time datum for unit operation was set up. Some methods of shortening operation changing time were also presented.
通过对钻孔加工族的时间研究,初步建立不同工步单件加工时间的标准资料,并探讨节省作业转换时间的方法。
By studying some boring machining families, standard time datum for unit operation was set up. Some methods of shortening operation changing time were also presented.
应用推荐