• 作业时间测定制定标准作业时间重要途径之一

    Operation time measurement is one of the important ways to give standard operation time.

    youdao

  • 根据现场获得数据应用MOD确定动作标准作业时间

    With the dada collected from the production line, MOD method is used to determine the standard operational time for each activity.

    youdao

  • 并以企业微型电泵装配分析结构装配工艺流程基础,得出其装配标准作业时间

    Take the assembly of micro electric pump in a corporation in Zhejiang as example, the standardized time is presented based on the analyses of its structure and assembly process.

    youdao

  • 分析装配线规划内容基础之上,提出了基于标准作业时间系统仿真装配线规划方法开发了相应原型系统

    Based on the content analysis of assembly line planning, a method for assembly line planning based on standard work time and simulation is proposed, and a corresponding prototype system developed.

    youdao

  • 资料第一件事计算十二个作业中的每一个花费时间平均值最小值极大标准

    The first thing I did with this data was to calculate the average, minimum, maximum, and standard deviation of hours spent on each of twelve assignments.

    youdao

  • 通过标准作业时间线平衡提升生产能力。

    To identity the productivity improvement opportunities by standardizing the process cycle time for each station and line balance.

    youdao

  • 轿车总装流水线条件,根据作业性质将标准工时划分增值时间非增值时间

    Under the condition of vehicle general assembly line, standard time is divided into value-added and non-value-added time.

    youdao

  • 通过钻孔加工时间研究,初步建立不同工步单件加工时间标准资料探讨节省作业转换时间方法

    By studying some boring machining families, standard time datum for unit operation was set up. Some methods of shortening operation changing time were also presented.

    youdao

  • 通过钻孔加工时间研究,初步建立不同工步单件加工时间标准资料探讨节省作业转换时间方法

    By studying some boring machining families, standard time datum for unit operation was set up. Some methods of shortening operation changing time were also presented.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定