• 这座艾默里克·部李纳设计2008年9月25通车。

    The bridge was designed by Aymeric Zublena and opened to road traffic on 25 September 2008.

    youdao

  • 湿度监测网络包含12个节点费利比高速网络7个,而比里线隧道26个

    The Humber Bridge humidity-monitoring network involved just 12 nodes, the Ferriby Road Bridge network had seven and the Jubilee Line tunnel had 26.

    youdao

  • 本文介绍了国道220线改造设计方案施工措施。

    This paper introduced Zhuchang Bridge renewal design project and construction method of national road No. 220.

    youdao

  • 本文介绍了国道220线改造设计方案施工措施。

    This paper introduced Zhuchang Bridge renewal design project and construction method of national road No. 220.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定