为了节约成本,2017札幌亚冬会没有建运动员村,而是指定了当地两家酒店作为运动员的官方接待点。
To save cost, the 2017 Sapporo AWG has not built athletes village, but chose two local hotels as official designated reception hotels for athletes.
为了节约成本,2017札幌亚冬会没有建运动员村,而是指定了当地两家酒店作为运动员的官方接待点。
To save cost, the 2017 Sapporo AWG has not built athletes village, but chose two local hotels as official designated reception hotels for athletes.
应用推荐