• 施工过渡能否顺利实施车站技术改造成功与否重要环节

    Whether or not the transition of the construction can be practiced is an important link of that the technical transformation of the railway stations.

    youdao

  • 文章贵州老山牵引变电所带电改造施工介绍了牵引变电所带电改造施工特点施工过渡方法

    Taken electrification rebuild of Guizhou Baolaoshan traction substations as an example, the characteristic and transition method of the project are introduced.

    youdao

  • 原配电位置一般不可移位移位过渡设计监理确定方案, 昆山水电安装监理指导下方能进行施工

    Position electrical box wife usually do not shift, if needs to shift to the transition box and and design, supervision to determine the program, under the direct supervision of construction.

    youdao

  • 笔者主要分析公路桥梁工程建设过渡施工技术提出施工质量控制措施

    The author mainly analysis the highway bridge engineering construction of transition section of construction technology, and put forward the construction quality control measures.

    youdao

  • 介绍了株六复线改造因线路拨移、线路交叉换侧、桥梁铺架车站封闭引起接触网施工方案过渡

    Introduces OCS construction transitional plan such as railway line-moving, line-crossing and side-exchanging, bridge and track laying, station closing up etc. on Zhuzhou-Liupanshui double track lines.

    youdao

  • 碾压沥青混凝土以及过渡施工主坝坝体填筑同步进行

    The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body go on in step with.

    youdao

  • 过渡方案实施缩短了施工工期确保施工质量安全

    The implementation of transitional plan dramatically improves the construction efficiency, shortens the construction schedule and guarantees the quality and safety of construction.

    youdao

  • 通过资料分析及时调整施工程序控制了因两侧过渡碾压均衡产生底接触面错动

    By analysing the monitoring data and adjusting the construction procedure in time, the relative displacement at contact surface of the wall footing caused by non uniform roller compaction of tran...

    youdao

  • 防腐施工工艺介绍混凝土表面处理方法防水过渡施工方法、防腐层的施工方法等。

    The anticorrosive project process give the handling method of concrete surface, the construction method of waterproof filtering layer and anti-corrosion layer, etc.

    youdao

  • 碾压式沥青混凝土以及过渡施工主坝坝体填筑同步进行的。

    The construction of roller compacted asphalt concrete core wall and the transition lager and the cons...

    youdao

  • 碾压沥青混凝土以及过渡施工主坝坝体填筑同步进行

    The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…

    youdao

  • 碾压沥青混凝土以及过渡施工主坝坝体填筑同步进行

    The construction of roller compacted asphalt concrete core wall and the transition lager and the construction of main dam body goo…

    youdao