新井位在什么地方?经纬度多少?
我们在这个地区打完了一口新井。
他们挖了一口新井。
新井位在什么地方?
所以即使在其他地方打一口新井,也可能是相同的结果。
So even if you dig a new well in some other place, the result will likely be the same.
如果发生这种情况,就需要新井和新管道来继续固碳工程。
If this happens, new Wells and pipelines would be required to continue the sequestration project.
根据新井的特点,对辅助运输系统提出了四点基本要求。
According to the characteristics of new mine, four essential requirements are put forward for the auxiliary conveying system.
更新井财街统一黑带及色带考试相片,详情请到剪影区!
Update Promotion test at Tseng Choi Street Community hall, Please go to Photo Album!
续而本文在储层分级的基础上预测产能,并得到新井试油的验证。
Productivity prediction was carried out on the basis of reservoir grading and was verified by oil testing in another new well.
当一口井干了,可以朝另一个方向钻新井(而不用挪到一个新的地方)。
When one well runs dry, another can be drilled in another direction (instead of moving to a new spot).
侧斜井固井工艺技术应用使侧斜井固井质量达到了与更新井相同指标。
The application of well cementing technical get the equal index with regeneration well on cement quality.
增加套管壁厚的方法已在陇东油区部分调整井及更新井中得到了应用。
The method of thickening the casing wall has been applied in some adjustment wells and renewed wells in Longdong unit.
该模型预测的结果可用于判断新井投产出砂和目前生产层位出砂的状况。
The result predicted with this model can be used to determine the sand producing condition in the newly developed layers and current producing layers.
可为水平井新井设计、完井方式选择、后期措施工艺选井等提供参考依据。
This classification would be useful to qualitatively design of horizontal well, selection of the completion method and treatment methodology of horizontal wells in late period.
根据经济产量的定义,对老井、新井及措施井的经济产量分析方法分别进行研究。
According to the definition of the economic yield, the paper research the economic yield analytical methods of the old well, the new well and improved well.
当原油供应下降并导致价格上升之时,任何能使新井勘探成本更低的技术都将受到欢迎。
As the supply of crude oil dwindles and the price thus rises, anything that makes the process of prospecting new Wells cheaper is to be welcomed.
针对复杂系统采用通路的技术方法,为新井设计的可行性论证提供一组合理的初始值。
A new way to feasible study of new mine designs is provided, and a series of primary data available for mine design is a...
提出了新井采用DPC内涂层套管,老井实施井下连续滴加缓蚀剂的内防腐蚀控制措施。
The corrosion protection measures were recommended such as DPC internal coating for the new pipes and continuous drip addition of corrosion inhibitor for the existing Wells.
市内设有两个火车站、一个高速公路出入口,有新无、新藁、新井、新曲等公路与邻县相通。
There are two railway stations in the city, a highway entrances and exits, there are no new, new Warashina, Arai, a new song, and so on the same highway and neighboring districts.
为此,开发出一套高泥、高钙、薄储层油层识别技术,应用于新井解释及老井复查,效果很好。
So a set of identification technique for thin reservoir with high mud and calcium content is developed and applied in new Wells interpretation and old Wells re-examination and obtains a nice effect.
为此,开发出一套高泥、高钙、薄储层油层识别技术,应用于新井解释及老井复查,效果很好。
So a set of identification technique for thin reservoir with high mud and calcium content is developed and applied in new Wells interpretation and old Wells re examination and obtains...
新井的用途是向旧井注入泥浆加重剂,这可以把喷油井压在泥浆的下方,进而防止更多的原油泄漏。
The new well will be used to fill the old one with heavy drilling mud that will press down on the reservoir below, stopping more oil from escaping.
本文在总结了前人工作的基础上,提出了井巷断面优化的通路法及新井总风压最优化的预测方法。
Bases on the study of experts and scholars, this paper puts forward the path method of cross-section optimization and the optimization forecasting method of air pressure of new roads.
减少了石油井架的搬运次数。当一口井干了,可以朝另一个方向钻新井(而不用挪到一个新的地方)。
It reduces the number of times oil RIGS need to be moved. When one well runs dry, another can be drilled in another direction (instead of moving to a new spot).
第二阶段使用新的中央处理设施对油田剩余部分的进行后期增量开发,并计划在2017年钻取7口新井。
Phase 2 covers the subsequent incremental development of the rest of the field with a new Central Processing Facility and seven new Wells expected to come on stream during 2017.
对于一口新井,确定原始地层压力、有效渗透率、总表皮系数、附加压力损失和流动效率,是试井的重要任务。
For a new well, it is an important work to determine initial reservoir pressure, effective permeability, summary skin coefficient, supplementary pressure loss and flow efficiency.
目前,在新井建设中,岩巷掘进工程量一般约占总工程量的40% ~ 50%,施工工期占35% ~ 50%。
At present, in the building of new shaft, rock drivage takes 40%-50% of whole project, and the construction takes 35%-50%.
目前,在新井建设中,岩巷掘进工程量一般约占总工程量的40% ~ 50%,施工工期占35% ~ 50%。
At present, in the building of new shaft, rock drivage takes 40%-50% of whole project, and the construction takes 35%-50%.
应用推荐