成本估算,预定的开始日期,采取控制的工作分解结构层次上的职责分配。
Cost estimates, scheduled start dates, and responsibility assignments to the level of the WBS at which control will be exercised.
基于并行工程方法,分析了飞机环境控制系统的研制流程和系统设计的结构层次;
Based on concurrent engineering, the development process of the environment control system for aircraft and the structure of system design are analyzed.
基于并行工程方法,分析了飞机环境控制系统的研制流程和系统设计的结构层次;
Based on concurrent engineering, the development process of the environment control system for aircraft and the structure of system design are analyzed.
应用推荐