• 成本估算预定开始日期,采取控制工作分解结构层次职责分配

    Cost estimates, scheduled start dates, and responsibility assignments to the level of the WBS at which control will be exercised.

    youdao

  • 基于并行工程方法,分析飞机环境控制系统研制流程系统设计结构层次

    Based on concurrent engineering, the development process of the environment control system for aircraft and the structure of system design are analyzed.

    youdao

  • 基于并行工程方法,分析飞机环境控制系统研制流程系统设计结构层次

    Based on concurrent engineering, the development process of the environment control system for aircraft and the structure of system design are analyzed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定