• 水位条件下采用人工基础存在很多隐患

    There are many hidden dangers using man-power hole pile foundation under the high water mark condition.

    youdao

  • 本文根据我校教学实验综合大楼人工基础施工过程论述设计施工管理。

    Based on the construction process of the pile foundation by hand-operated hole for the teaching and experiment composite building in our college, this article will deal with its design...

    youdao

  • 近几年冶金工业厂房工程设计采用人工基础本文论述人工挖孔桩优点、设计计算构造应用

    This article depicts the advantages, design calculation, structure and application of the concrete piles in men-made hole used in the industrial metallurgical building in the recent years.

    youdao

  • 针对复杂地质条件上部集中的荷载结构基础要求通过综合技术分析,选用灌注基础

    Aimed at complex geology condition and requirements of big and concentive loading structure on upper part for foundation, drilled cast piles foundation is selected through comprehensive analysis.

    youdao

  • 人工挖孔灌注高层建筑常用一种桩基础形式施工质量好坏直接影响到建筑的结构安全

    Usually the poured pile by artificial excavation expanding bottom is one foundation pile style of tall building, whose quality can affect the structural safety of the construction directly.

    youdao

  • 该楼框架结构采用人工挖孔基础

    The building with frame structure is based on manual cavity expansion pile foundation.

    youdao

  • 孔桩施工技术复杂岩溶地质条件下适应性,冲击技术不均匀地层具有良好适应性,实践证明冲击钻进岩溶发育最佳的嵌岩桩基础施工技术。

    The adaptability of the bored pile and excavated pile construction technique in the complicated karst geology region is bad, but that of jetting bore pile is good in karst region.

    youdao

  • 孔桩施工技术复杂岩溶地质条件下适应性,冲击技术不均匀地层具有良好适应性,实践证明冲击钻进岩溶发育最佳的嵌岩桩基础施工技术。

    The adaptability of the bored pile and excavated pile construction technique in the complicated karst geology region is bad, but that of jetting bore pile is good in karst region.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定