大的项目被分解成更小且易管理的部分,称作子系统。
Large projects are decomposed into smaller, more manageable pieces called subsystems.
在每个项目管理应用的领域中,这四个阶段可以被设计成用来满足每种类型项目的控制需要。
These can be designed to suit the control requirements of every type of project in every area of project management application.
它将项目工作范围分解成更小的、易于管理的工作包,以提高对项目活动的控制力。
The WBS divides the scope of the project work into smaller, manageable work packages for maintaining better control of the project activities.
这一成果是在美国能源部(DOE)的光伏孵化项目支持和其下属部门国家可再生能源实验室(NREL)管理下取得的。
This achievement was supported under the U. S. Department of Energy (DOE) PV Incubator Program, managed through DOE's National Renewable Energy Laboratory (NREL).
将会负责游戏及相关功能的各项需求,具体包括成一款多人休闲网络游戏的:产品设计,原型设计,界面设计,数值平衡,文档撰写,项目管理;
Responsible for all aspects of games and feature's creation and production, including design, prototyping, UI design, balancing, documentation and project management of a MMO project;
将会负责游戏及相关功能的各项需求,具体包括成一款多人休闲网络游戏的:产品设计,原型设计,界面设计,数值平衡,文档撰写,项目管理;
Responsible for all aspects of games and feature's creation and production, including design, prototyping, UI design, balancing, documentation and project management of a MMO project;
应用推荐