• 首先本文分析成桥阶段应力

    Firstly, analyze the main girder stress in different stage in the paper.

    youdao

  • 论述了斜拉成桥后索力调整意义作用

    Significance and functions of the cable force adjustment are discussed.

    youdao

  • 保证线,对主施工进行位移监测

    We also measured the displacement of major bridge construction for line type precision.

    youdao

  • 对比分析成桥状态理论截面应力实测截面应力。

    Bridge compared with the measured stress state theory section section stress.

    youdao

  • 基于内力平衡,对自锚式悬索成桥吊索进行研究。

    Based on the internal force equilibrium method, the hanger forces of completed self-anchored suspension Bridges have been researched.

    youdao

  • 施工阶段阶段运营阶段弹性稳定性进行了分析。

    The linear elastic stability of the bridge during the construction phase, completed bridge phase and operation phase are analysed.

    youdao

  • 已合拢混凝土质量得到了保证线形符合设计要求

    And the quality of the concrete of the closure section is guaranteed, the alignment of the bridge also conformity the design expect.

    youdao

  • 通过施工过程检测试验来验证设计和施工方法可靠性

    Based on the detections of the construction process and the tests of the completed bridge, it is shown that the design and construction methods are reliable.

    youdao

  • 结果表明无论是状态还是施工状态均具有足够抗风稳定性

    Calculation results presented here show that the bridge is of enough wind stability under both under-construction state and completion state.

    youdao

  • 因此斜拉施工监测确保施工安全成桥质量至关重要的

    It is various that in order to ensure construction quality and structural safety, construction monitoring is one of the most important jobs.

    youdao

  • 计算得到成桥状态几何线形控制点标高设计标高相比,误差很小

    The error between the calculated values and the design ones of elevations at controlling points in the designated status is very small.

    youdao

  • 分别位移弯矩整体受力状态控制目标确定吊杆内力

    The internal force of the hanger rods when completing the bridge shall be determined by displacement, bending movement and the integral forced status as the control objective.

    youdao

  • 成桥荷载试验结果表明互通立交施工质量完全符合设计要求

    The results of the field load tests prove that the construction quality is fully accord with the design requirements.

    youdao

  • 成桥状态分析了不同倾角异形空间组合肋拱受力性能影响

    Influence of different camber Angle on special-shaped spatial combination arch-rib arch mechanical behavior is analyzed under completion state.

    youdao

  • 拱梁组合设计施工分析确定状态吊杆拉力非常关键

    In design and construction of composite arch and Beam bridge, it is very important to determine the boom tensile force when the bridge is almost completed.

    youdao

  • 营口辽河公路背景,研究斜拉施工阶段状态的抗性能

    Taking Liaohe River Highway bridge in Yingkou as the research object, the wind resistance performance of cable-stayed Bridges under construction and at the completion state was analyzed.

    youdao

  • 以此力作正装计算控制拉索力,通过正装计算得到一个状态

    Then the forward calculation is also used to get the tensile cable forces of the construction process to gain a finished bridge state under the control of the former forces.

    youdao

  • 实践证明,龙华松花江特大成桥线形合拢精度均达到施工规范要求

    Practice results proved that the closure precision and the alignment of bridge after being folded reached the demands of the construction criterion.

    youdao

  • 介绍跨度不对称曲线预应力混凝土连续梁设计试验

    In this paper, the design of the long span asymmetric prestressed concrete curved continuous girder bridge, and static and dynamic load tests for the completed bridge are described.

    youdao

  • 另外稳定问题研究多集中成桥阶段施工阶段的稳定问题研究不够深入

    In addition, the stability studies are almost related to completed bridge or its service stage, the issues of construction stability haven't been studied deeply.

    youdao

  • 方法东江最大悬臂阶段成桥阶段塑性极限承载力进行了评估。

    And based on this way, the elastic-plastic ultimate bearing-load capacity of Dongjiang Bridge in largest cantilever stage and finished stage were assessed.

    youdao

  • 扣索控制优劣直接影响肋线形好坏,从而对于承载受力有着重要影响。

    Cable control effect infect the shape of span arch directly, even infect the bear of weight of bridge.

    youdao

  • 本文甘肃省某水电站临时交通工程背景悬链线确定索道成桥状态

    Based on the temporary traffic bridge in Gansu province as an engineering background, using catenary method to determine the completion state of cableway bridge.

    youdao

  • 借助1∶30整体模型研究了施工阶段成桥阶段全主梁应力水平分布状况

    The stress level and distribution of the main girder during construction and service stage at 1/30 model are studied.

    youdao

  • 文章提出简便的计算影响矩阵方法,可以方便地进行斜拉索力优化

    An efficient computational method of the influence matrix is proposed for cable force optimization so as to calculate the cable force of cable-stayed Bridges under dead loads easily.

    youdao

  • 介绍了益阳资江三结构特点,以及动力荷载。验仪器方法测试结果

    This paper deals with the structural characteristic of the Third bridge of Yiyang Zijiang River, and the instrument, method and the result of static load and dynamical load test on new Bridges.

    youdao

  • 通过梁拱组合式状态目标优化分析可以得到不同施工阶段合理吊杆内力

    Rational internal force of hangers under different construction stage can be obtained through optimization analysis of the object under the finished bridge condition of the camber composite bridge.

    youdao

  • 自锚悬索理想状态吊索借用斜拉常用的几种索力优化方法进行研究

    The rational cable force of self-anchored suspension bridge can be researched by the methods being used in optimizing the cable force of cable-stayed bridge.

    youdao

  • 施工阶段阶段以及运营阶段的受力进行研究得到了受力特点

    Did mechanic behavior research in construction, finished bridge and operation stages. got mechanical characteristics of You Dun Gang bridge.

    youdao

  • 另外本文还简单介绍了斜拉成桥索力调整影响阵法拉索的自重垂度对索力的影响。

    Besides, the paper simply introduces the influence matrix method of the adjustment of cable forces after construction and the droops affections for cable forces.

    youdao