对地下矿山开采而言,保证巷道开挖与支护稳定是矿山安全生产的前提。
It means to the underground mine that the stability to the excavation and support of the roadway is the precondition for the safe production in mine.
并结合雪峰山隧道F8断层开挖与支护方法的选择,实践验证了模型可行性。
The model combines choices of methods of excavation and shoring in the F8 Fault of Xuefenshan tunnel, validates its feasibility by practice, and illuminates its academic and practical value.
针对深基坑土钉墙支护,采用三维非线性有限元分析方法,模拟研究了深基坑的开挖与支护过程。
In accordance with soil nailing for deep excavation support, the 3-dimensional nonlinear FEM analysis and calculation was used to simulate the process of construction.
针对南芬铁矿地下硐室开挖与支护设计,采用有限元分析研究大跨度地下硐室施工的动态力学效应。
This paper approaches the excavating dynamic behavlour and support design for a large cavern in Nanfen Iron Mine using finite element method.
主要介绍了龙滩水电站三大洞室的开挖程序、开挖方法、开挖与支护之间关系,以及监测手段在工程中的指导作用。
The excavation procedure, the excavation measures, the relations between excavation and support, and the effect of the guidance of monitoring measures on project are presented in the paper.
基坑工程主要包括基坑支护体系设计与施工和土方开挖,是一项综合性很强的系统工程。
Excavation engineering mainly include excavation support system design and construction, and soil excavation etc. It is strong comprehensive system engineering.
通过有限元数值分析软件ANSYS对深基坑开挖与土钉支护的全过程进行了模拟。
The whole procedure of a foundation pits excavation and its soil-nailing support is simulated with the FEM software ANSYS.
主要包括方案的选择,土钉墙与桩锚结合支护结构的支护体系设计,基坑开挖及监控测量。
Include choice of scheme, support system design of soil-nailing wall and anchor-pile composite supporting structure, excavate and monitor measurement in excavation engineering.
分析和探讨了隧道围岩变形与围岩类别、开挖方法、支护时机及支护参数之间的关系;
The relationships among the deformation of surrounding rock masses, the class of surrounding rock masses, excavation method, time of support and parameters of the support are put forward.
注浆加固与锚杆支护技术相结合,可以提高围岩承载能力,减少巷道变形,确保大硐室开挖中的支护安全、有效。
This paper introduces the application of grouting stabilization in the excavation of big chamber within the fracture zone and the obtained results.
而基坑支护就是为保证基坑开挖,基础施工的顺利进行及基坑周边环境的安全,对基坑侧壁以及周边环境采用的支挡、加固与保护等措施。
Bracing of foundation pit is to ensure that excavation and foundation construction for the smooth and safe environment foundation pit and used the pit retaining wall reinforcement and protection.
在深基础结构工程设计中,将地下连续墙、地下室底板和部分楼板、梁作为深基坑开挖时的支护体与临时支撑;
So-called composite (three functions) deep foundation structure is defined as: to use slurry wall, basement base plate and a part of plate beam as foundation pit bracing;
在深基础结构工程设计中,将地下连续墙、地下室底板和部分楼板、梁作为深基坑开挖时的支护体与临时支撑;
So-called composite (three functions) deep foundation structure is defined as: to use slurry wall, basement base plate and a part of plate beam as foundation pit bracing;
应用推荐