• 研究了装配线情况下订单交货期决策问题建立电子订单排成本模型

    Delivery date decision of orders for multiple assembly lines is studied. An assembling cost model of electronic product orders is constructed.

    youdao

  • 最后,针对仿真结果分析产线中的问题,提出优化方案在制品控制优化方案、人员配置优化方案分别重新建立了生产线物流的模型

    Finally, the problem of the production line is diagnosed by simulation and the model is rebuilt based on schedule optimized scheme, WIP optimized scheme, people optimized scheme.

    youdao

  • 最后,针对仿真结果分析产线中的问题,提出优化方案在制品控制优化方案、人员配置优化方案分别重新建立了生产线物流的模型

    Finally, the problem of the production line is diagnosed by simulation and the model is rebuilt based on schedule optimized scheme, WIP optimized scheme, people optimized scheme.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定