因支护或衬砌增加的开挖量由甲方代表按实计量并折算成隧道延米计价。
Due to support or increased excavation volume caused by lining, Party a shall measure again and converted it to total length of the tunnel.
地质塌方、转弯段的技术性超挖按实计量并折算成隧道延米计价。
Geological landslides and technical over-break in turning part shall be measured again and converted to total length of the tunnel.
经理论分析和数学推导表明,全局稳定性的一个简单充分判据与时延无关,并具有实可调参数。
The simple condition giving for global asymptotic stability is independent of delays and possesses adjustable real parameter.
经理论分析和数学推导表明,全局稳定性的一个简单充分判据与时延无关,并具有实可调参数。
The simple condition giving for global asymptotic stability is independent of delays and possesses adjustable real parameter.
应用推荐