例如工程签证,就是索赔中的一个重要内容。
Such as engineering visas, the claim is an important element.
而工程签证则就是工程项目中常规工作的内容。
Visa, and the works of the project is the work of the conventional content.
我在申请485签证的时候已经通过了合格的技术评估,那么我是否还需要通过适工程序(jrp)的评估?
Will I be required to meet the JRP as I already hold a suitable skills assessment obtained when applying for my subclass 485 visa?
如果你是在2010年1月1日之前申请了永居技术移民签证,那么你不再需要通过适工程序(jrp)的评估。
If your application was lodged before 1 January 2010, you are not required to meet the JRP as part of your skills assessment provided your application is for a permanent GSM visa.
同时,在工程实施阶段,运用过程控制原理控制各清单子目的完成情况,并对现场签证及索赔管理进行了论述。
At the same time, it applies process controlling theory to engineering execution phase to control the items of B. Q, and discourses visa and claiming for compensation management.
本合同计量以监理工程师现场签证为准。
Measurement was attested by supervising engineer in this contact.
负责工程项目从工程施工准备开始直至验收交工,以及签证结算的全过程施工管理工作。
Responsible for the project from construction preparation to completion acceptance, the whole process of construction management and settlement.
我是在2010年1月1日之前申请的永居移民技术移民签证,但尚未获得技术评估,那么我是否需要通过适工程序(jrp)的评估?
I lodged my General Skilled migration (GSM) visa application for permanent migration before 1 January 2010 and have not yet received my skills assessment. Am I required to meet the JRP?
许多外国大学生源源不断地涌入美国大学,攻读科学、技术、工程以及数学的硕士和博士学位,但是很多人在毕业之后无法拿到在美国工作和生活的签证。
Many foreign students come to the United States to earn advanced degrees in science, technology, engineering and math. But many are unable to get a visa to live and work here after they graduate.
本文介绍了与工程造价相关的工程计量签证、工程变更及竣工结算审核几个环节的相关管理。
This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.
任何一方强迫对方使用不合格的建筑材料、设备和构配件于本工程的,都要签证记录在案,由此引起的一切后果由强迫一方负责。
Either party was forced to apply unqualified building materials, devices and component and fittings which shall be attested and placed on record. Aftermath shall be on the forcer's head.
哪些签证和职业受到适工程序规管?
设计变更、工程量签证、工程进度款支付、审核管理工作;
In charge of design changes, engineering quantity visa, project payment progress and audit management;
文章诠释了工程结算审核的一般内容,分析了对签证和索赔的反驳。
This article annotates the general contents about the audit of the project cost, also emphatically analyzes the refutable measures against the confirmation and counterclaim of a project.
现行的工程量清单计价方法,工程竣工结算一般由合同价、材料调差及签证索赔三部分组成。
BOQ existing valuation methods, the project completed by the contract price settlement in general, materials transfer and visa poor claim is composed of three parts.
第二十六条第二十四条第一项之空气污染防制计画,应经依法登记执业之环境工程技师或其他相关专业技师签证。
Article 26 the air pollution control plan in Article 24, Paragraph 1 shall be signed by a legally registered and practicing environmental engineer or other relevant professional engineer.
第二十六条第二十四条第一项之空气污染防制计画,应经依法登记执业之环境工程技师或其他相关专业技师签证。
Article 26 the air pollution control plan in Article 24, Paragraph 1 shall be signed by a legally registered and practicing environmental engineer or other relevant professional engineer.
应用推荐