在福州961人防工程乌山主通道工程施工中采用中洞先行的施工方法,地功地控制了地表变形,保证了地表建筑物的正常使用。
Center drift first construction method was adopted in Wushan main tunnel of Fuzhou 961 Civil Air Defence Work, and ground surface deformation was well controlled.
但是工程实践和所发生的工程灾害迫切地需要深入地研究材料损伤破坏机制,以解决并控制这些重大工程灾害地发生。
But (engineering) practices and disasters press for us to deeply study the damage mechanism of materials in order to control severe engineering disasters.
但是工程实践和所发生的工程灾害迫切地需要深入地研究材料损伤破坏机制,以解决并控制这些重大工程灾害地发生。
But (engineering) practices and disasters press for us to deeply study the damage mechanism of materials in order to control severe engineering disasters.
应用推荐