• 这项工程估价了吗?

    Has this project been costed?

    youdao

  • 国际铁路工程估价国际铁路工程管理领域正确进行投标报价决策重要依据

    International railway project evaluation is an important evidence for correct quotation and decision-making in the field of international railway project management.

    youdao

  • 不仅涉及经济学理论学科同时土木工程经济》、《工程估价》等应用型学科密切相关

    It involves not only the economics and other theories disciplines, at the same time, and the Civil Engineering economy, project valuation and other closely related disciplines applied.

    youdao

  • 应用型本科工程管理专业工程估价课程理论覆盖面广,且工程应用紧密结合的专业核心课程,学时又相对较少。

    Project budget course is a core course of engineering management specialty, the course has the wide coverage theory, closely integrated with engineering application, but has a few class time.

    youdao

  • 因此建筑行业房地产行业的各自建筑面积不能相互套用,不同时期的建筑面积不能相互代替使用,特别是工程估价深究慎用。

    So construction area calculating methods could not exchange, which should be paid attention especially of the project estimation, between construction and real estate industry.

    youdao

  • 基因工程领域的重要发现正促使农业专家传统耕作方式进行估价

    Important new discoveries in genetic engineering are causing agricultural experts to transvalue traditional farming practices.

    youdao

  • 这项工程工程估价为50 000美元。

    The work was costed by the engineer at $50,000.

    youdao

  • 这些成本估价工程开工之前必须先得到运营商工程主管或者运营商执行主管书面批准

    These cost estimates must be approved by the OPERATOR Construction Supervisor or the OPERATOR Implementation Supervisor in writing prior to the start of any WORK.

    youdao

  • 并且介绍施工工艺工程费用估价

    And the paper introduces construction technology and estimating fee of island engineering.

    youdao

  • 工程根据地10条的规定,按附录提供资料进行估价

    The works shall be valued as provided for in the Appendix, subject to Coause 10.

    youdao

  • 由于大多数工程招标中一般最低价中标,所以对于中标者来说,在投标估价过程中的任何投入都是浪费。

    Since only the lowest bidder will be the winner of the contract in most bidding contests, any effort devoted to cost estimating is a loss to the contractor who is not a successful bidder.

    youdao

  • 承包商必须在实地勘测站点5个工作日提交工程成本估价运营商

    The cost estimate for those SITEs would be delivered to OPERATOR within 5 business days following the actual SITE visit.

    youdao

  • 介绍钻孔地质变化引起工程变更估价原则估价方法

    This paper introduces the appraisal principles and methods of engineering changes are caused by geologic changes in drilling hole pour pile.

    youdao

  • 同一商品房项目进行不同形式的在建工程转让,即使采用相同估价方法选用资料数据的状况也将是相同的。

    If both transfers happen to the same construction in progress, even if the same method is applied, the materials and data to be selected should be different.

    youdao

  • 提出夯扩工程清单编制估价中的若干技术要点

    It puts forward some key points of technique on compilation and evaluation for the bill of quantity of rammed and expanded piles.

    youdao

  • 某些工程一旦开工可以进行估价

    On some projects it may only be feasible to assess the cost once the work has been carried out.

    youdao

  • 详细估算或者称为明确估价工程范围基本明确、详细设计正在进行、项目基本特征已经确定做出

    The detailed estimate or definitive estimate is made when the scope of work is clearly defined and the detailed design is in progress so that the essential features of the facility are identifiable.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定