这项工程估价了吗?
国际铁路工程估价是国际铁路工程管理领域正确进行投标报价及决策的重要依据。
International railway project evaluation is an important evidence for correct quotation and decision-making in the field of international railway project management.
它不仅涉及《经济学》等理论学科,同时又与《土木工程经济》、《工程估价》等应用型学科密切相关。
It involves not only the economics and other theories disciplines, at the same time, and the Civil Engineering economy, project valuation and other closely related disciplines applied.
应用型本科工程管理专业的工程估价课程,是一门理论覆盖面广,且与工程应用紧密结合的专业核心课程,但学时数又相对较少。
Project budget course is a core course of engineering management specialty, the course has the wide coverage theory, closely integrated with engineering application, but has a few class time.
因此,在建筑行业和房地产行业的各自建筑面积不能相互套用,不同时期的建筑面积不能相互代替使用,特别是在工程估价中应深究慎用。
So construction area calculating methods could not exchange, which should be paid attention especially of the project estimation, between construction and real estate industry.
基因工程领域的重要新发现正促使农业专家对传统的耕作方式进行估价。
Important new discoveries in genetic engineering are causing agricultural experts to transvalue traditional farming practices.
这项工程据工程师估价为50 000美元。
这些成本估价在工程开工之前必须先得到运营商工程主管或者运营商执行主管的书面批准。
These cost estimates must be approved by the OPERATOR Construction Supervisor or the OPERATOR Implementation Supervisor in writing prior to the start of any WORK.
并且介绍了施工工艺及工程费用估价。
And the paper introduces construction technology and estimating fee of island engineering.
工程款应根据地10条的规定,按附录中提供的资料进行估价。
The works shall be valued as provided for in the Appendix, subject to Coause 10.
由于在大多数工程招标中一般都是最低价中标,所以对于未中标者来说,在投标估价过程中的任何投入都是浪费。
Since only the lowest bidder will be the winner of the contract in most bidding contests, any effort devoted to cost estimating is a loss to the contractor who is not a successful bidder.
承包商必须在实地勘测站点后5个工作日内提交工程的成本估价给运营商。
The cost estimate for those SITEs would be delivered to OPERATOR within 5 business days following the actual SITE visit.
介绍了钻孔桩地质变化引起的工程变更的估价原则和估价方法。
This paper introduces the appraisal principles and methods of engineering changes are caused by geologic changes in drilling hole pour pile.
同一商品房项目进行不同形式的在建工程转让,即使采用相同的估价方法,其所选用资料和数据的状况也将是不相同的。
If both transfers happen to the same construction in progress, even if the same method is applied, the materials and data to be selected should be different.
提出了夯扩桩工程清单编制和估价中的若干技术要点。
It puts forward some key points of technique on compilation and evaluation for the bill of quantity of rammed and expanded piles.
在某些工程中,一旦开工就可以进行估价。
On some projects it may only be feasible to assess the cost once the work has been carried out.
详细估算或者称为明确估价是在工程范围基本明确、详细设计正在进行、项目的基本特征已经确定时做出的。
The detailed estimate or definitive estimate is made when the scope of work is clearly defined and the detailed design is in progress so that the essential features of the facility are identifiable.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.