应用传统的成本和工期管理已经不能够准确反映出成本与进度的绩效水平,更不能进行信息的集成控制。
The cost of application tradition and the time limit management cannot mirror exactly the performance level of cost and progress, not to mention the integration control of information.
编制工程进度月计划、周计划以控制阶段工期的如期完成。
Work out monthly progress plan and weekly progress plan to ensue the construction schedule in different construction stages to be completed on time.
文章把对工期的控制作为进度控制的重要指标来论述并提出相应建议。
The time limit for the control as an important index of progress control to discussed and puts forward the corresponding proposal.
加强施工进度控制,按合同工期履约交竣工,是施工企业生产组织的重要工作内容。
Strengthening construction plan commanding and finishing construction on time are important contents in producing organization of construction company.
深化项目法施工,加强工期控制和进度控制,实现企业效益的最大化。
In order to increase the level of project construction, this paper proposed the strategy of intensifying the time limit control and cost control.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;