• 通过工作时间的合理分配优化分析样品组合保持合理的分析周期

    By rationalize time allocation, optimizing combination the samples in hand, to keeping the reasonable lead time.

    youdao

  • 利用更换周期具有马尔可夫性质,以系统首次故障平均工作时间大为目标建立了确定最佳更换周期模型

    Using the property of Markov at the points of replacement period, a model of determining the optimal period is developed with objective of maximizing the mean time to first failure of system.

    youdao

  • 利用更换周期具有马尔可夫性质,以系统首次故障平均工作时间大为目标建立了确定最佳更换周期模型

    Using the property of Markov at the points of replacement period, a model of determining the optimal period is developed with objective of maximizing the mean time to first failure of system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定