属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.
属于工作分解结构底层组成部分的计划工作叫做“工作细目”,可以安排在进度表中,估算费用,监视和控制。
The planned work contained within the lowest-level WBS components, which are called work packages, can be scheduled, cost estimated, monitored, and controlled.