控制室主控制台控制锌锅区设备及空气供给系统的电机驱动及气动装置。
The Main control Desk controls the motorized and pneumatic powered function of the pot area equipment plus the air supply system from the operator's pulpit.
驾驶室主控模块可以随时主动查询轮胎检测模块的工作状态,低成本、低功耗、更加稳定可靠。
The main control module of the cab can automatically inquire the working status of the tire detection module at any time, thereby reducing the lost and power consumption and prompting the reliability.
这儿是主控室。
与新核电站的相比,老核电站的主控制室略微小些。
The main control point of the plant looks bit small if being compared to its contemorary brothers on the modern power plants.
利用光缆传输系统实现变电站主控制室的上位机与现场的测量系统之间的通讯以提高系统整体抗干扰能力和信号传输的可靠性。
Optical cable is applied to communicate between measurement system near transformers and upper computer in main controlling room in order to improve reliability of monitoring system itself.
介绍了主控室报警处理计算机辅助系统的设计思想、开发环境、功能流程以及该功能在大亚湾核电站主控室的实施应用情况。
The design ideology, exploring environment, the function flowing of the real time alarm process computer aided system and it 's application in Daya Bay Nuclear Power Station are introduced.
该工程模拟器已应用于核电站安全分析,以及为核电站先进主控室设计提供软件支持和验证服务。
The simulator has been used for NPP safety analysis and to provide support and validation service for the design of advanced main control room.
冶金行业:主控制室、变配电室、储油间、激光焊机室等。
Metallurgy industry: Control room, Electrical substation, oil soaking room, Important room such as laser welder room.
在制冷空调综合系统的设计建设中,采用S7- 200型PLC作为系统的主控制器,对能实现制冷和中央空调实验实训的综合实验室进行全自动控制。
In the design and construction of refrigeration and air-conditioning synthesis system, the full automatic control is done by adopting S7-200 PLC as main controller.
DIAS系统可以为核电厂主控室人机界面的设计及改进提供很好的技术支持。
DIAS system can provide good technical supports to the design and improvement of man-machine interfaces of the main control room of a (nuclear) power plant.
摘要:人因工程是人机接口的系统工程,主控室是核电站中人机接口最集中的地方。
Abstract: human factors engineering (HFE) is the system engineering of human system interfaces (HSI) which are concentrated in the main control room of the nuclear power plant.
分别在驾驶室各处安装报警延伸复位按钮盒4套,敷设电缆线并接线,由接线箱或主控单元至各延伸报警复位按钮盒电缆,共计:电缆四条。
Mount remote reset unit (4 PCS) in different places on the bridge and laying cable (2 core, 4 PCS) from remote reset unit to main control unit or junction box.
分别在驾驶室各处安装报警延伸复位按钮盒4套,敷设电缆线并接线,由接线箱或主控单元至各延伸报警复位按钮盒电缆,共计:电缆四条。
Mount remote reset unit (4 PCS) in different places on the bridge and laying cable (2 core, 4 PCS) from remote reset unit to main control unit or junction box.
应用推荐