用来完成车间内部和车间与车间之间的自动连续搬运。
Used to complete the workshop within and between the workshop and workshop automatic continuous handling.
包装部:车缝部的辅助部门,协助完成车间生产袋子的非车缝工作,如包装,剪线,翻袋等等。
Packing section: auxiliary section of sewing section. Assist to finish non-sewing work in producing bags, such as packing, cut threads, turn over bags, etc.
软件的所有这些决定都和交货期、材料利用率以及车间产能相关,而且所有这些决定都是实时快速完成的。
All decisions the software makes correlates the due date with material utilization and shop capacity, and all of it happens in real time.
主要工作在车间的这个部分完成,这里还是非常整洁的。
Main works are carried out in this part of the workshop which is very clean.
输送机和机械人把装配中的电脑从一个车间输送到另一个车间;工人刚完成她面前的一组半成品,瞬间又有一组送到她的面前。
Conveyers and robots take the evolving computer from station to station; each unit arrives in front of a worker a split second after she has finished with the previous one.
SAIC将在位于圣迭戈附近的车间进行生产工作,交付工作将在2009年至2010年间完成。
SAIC will manufacture the systems near San Diego and will deliver them throughout 2009 and 2010.
主要作业表和车间控制是怎么完成的?
How is master scheduling and shop floor control accomplished?
在建造或制造开始前,完成装配图和零件图以把必要信息传达给车间工人是必须的。
Before construction or manufacture can begin, it is necessary to have complete assembly and detail drawings to convey all necessary information to the shop men.
有朝一日,这家公司希望可以把Nano的组装件运送到各地的小型车间,并在这些分散的“工厂”中完成对汽车的组装。
The company hopes one day to ship the Nano in knocked - down units to local garages for the cars to be assembled in these distributed "factories."
防尘防结露,全程在无尘车间完成,激光器完全密封,并作干燥处理。
Completed in the dust-free workshop, the laser source is totally sealed with drying processfor against dust and fog.
制造车间作业计划就是确定工件的加工顺序,确定机器加工每个工件的开始时间和完成时间。
The job planning in a manufacturing workshop is to fix on the machining sequence, the starting time and finishing time for each part.
最后,完成电气主接线、车间平面图、二次回路图的绘制。
Considerr revising, the completion of the main electrical wiring, workshop plans, mapping secondary circuit.
在生产完成时,由操作工和车间检验员进行末检。
Operators and inspectors of workshop do the last piece inspection when production is completed.
提出了融合当地气象预报资源,完成大惯性恒温车间温度控制的一种模型结构。
This paper proposes a model structure based on the integration of the local meteorological forecasting resources to accomplish temperature control of large inertia constant temperature workshop.
根据收货清单确认、接收送至车间的货物,并完成入库单。
Receive delivered goods at workshop, check the parts in accordance to the delivery note, and complete goods received note.
骨灰冷却过程在预备室内完成,改善了火化车间的卫生条件。火化过程中体现文明、人性化理念。
Cooling process of the ashes is finished in the preparation room to improve sanitation cremation workshop and embody civilization and the concept of humanity in the process of cremation process.
我们必须把各车间未完成的产品记个准确数。
We must keep an exact account of the unfinished products in the workshops.
一项工作完成后车间统计人员要把所用的工日和设备台帐报给场地部统计人员。
After completion of one work, workshop statistician shall report to statistician of Yard Department the used man-day and Equipment Account.
工作完成后他们收放好工具离开车间了。
The work done, they put away their tools and left the workshop.
与持续改善团队合作完成持续改善,降低生产成本,实施解决方案,优化车间生产程序及快速换型。
Participate with the team and Kaizen teams in cost reduction projects, implementation of solutions, optimization of shop floor procedures quick changeovers, etc.
2012年再次扩大生产,新增冲压、注塑车间,完成关键部件建自主生产。
In 2012, re-expanded production, punching and injection workshop were added. Critical accessories can be produced by ourselves since then.
机头置于车间空余位置,只需两名操作人员即可完成挂皮、收皮操作。
The machine head place among the car empty remaining position, need only two operate the personnel and can immediately complete to hang the skin and accept the skin operation.
建立了基于网络的焦炉管理专家系统,完成了以炼焦车间基本信息和焦炉生产实时数据的信息管理系统;
The coke oven management expert system based on network has set up, the basic information and coke oven production real- time data information management system is completed;
在生产完成的情况下结束车间工作单。
而其成功的关键是同一时间团队紧密合作的结果,比如Genba车间在一周内员工紧密的合作,通过不断地练习完成快速改变的导入。
The key successes of Kaizen week are a time with a full time commitment team, and the introduction of rapid changes at Genba (shop floor) within a week's exercise.
本文结合压铸车间设备管理一体化的功能要求,完成了压铸车间远程监控系统的设计与开发。
The thesis describes how to design and develop the remote monitor system for the Magnesium die casting plant according with the requirements for integrative management of die casting plant.
针灸针系列产品的生产制作必须在10万级净化车间完成。
The medical devices must be manufactured in 10 thousand class cleaning-room .
针灸针系列产品的生产制作必须在10万级净化车间完成。
The medical devices must be manufactured in 10 thousand class cleaning-room .
应用推荐