• 本文介绍广东大亚湾核电站方面管理经验

    This paper introduces the managerial experience of Guangdong Daya Bay PNS on this aspect.

    youdao

  • 确保大亚湾核电站安全运营前提下加快施工进度。

    In premise of assuring the safety of Daya Bay nuclear power station, the construction speed can be increased.

    youdao

  • 大亚湾核电站安监会成员,可各个管理层级自由出入

    I served on a safety oversight board at the Daya Bay plant, and we had free access to the facilities, including all levels of management.

    youdao

  • 同时简要介绍了大亚湾核电站培训管理组织机构培训设施

    At the same time, the training management organization and training facilities of Daya Bay NPP are briefly introduced.

    youdao

  • 针对大亚湾核电站1机组并网过程出现故障进行了分析说明

    That the fault occurred in the synchronization process of Daya Bay Nuclear Power Station unit 1 is also analyzed and illustrated.

    youdao

  • 同时承担大亚湾核电站提供了数以千计备品备件制造供应任务。

    Meanwhile, we assumed the manufacture and supply for thousands of Repair Pieces and Awaiting Parts to Daya Bay Nuclear Power Plant.

    youdao

  • 本文介绍了大亚湾核电站调试锅炉工程总体布置系统设计以及实施效果

    This paper briefly describes the general layout and system design of preoperational test boilers of Daya Bay Nuclear Power Station and the economic benefits attained therefrom.

    youdao

  • 描述贯穿于广东大亚湾核电站日常工作组织过程始终的风险分析概念方法。

    The work organizing process integrated with risk analysis of Guangdong Daya Bay Nuclear Power Station (GNPS) is depicted.

    youdao

  • 方法大亚湾核电站18个月换料项目提高功率因子的分析论证中应用

    The DRM has been used for justification of increasing core power factor in Daya Bay NPS18-month fuel cycle project.

    youdao

  • 结果表明大亚湾核电站采用18个月换料之后,中小破口失水事故时仍有较大安全裕量。

    The results show that the large margin is obtained in Guangdong Nuclear Power Plant with 18-Months fuel cycle.

    youdao

  • 如果人人坚持这样做,全国每年180亿度,相当于大亚湾核电站发电量总和

    If everyone keeps on doing this, we can save 180 billion KWH in nationwide which equals the total annual power generation of three Daya Bay Nuclear power Stations.

    youdao

  • 大亚湾核电站循环提高燃料组件富集度后实现18个月燃料循环的第二个循环堆芯。

    The tenth cycle core of GNPS is the second cycle with 18-month fuel cycle after increasing fuel enrichment.

    youdao

  • 介绍了大亚湾核电站堆芯换料设计准则、计算机程序、设计内容以及设计预计值与测量值比较。

    The design criteria, codes, basic principles and contents of the reload design for Daya Bay Nuclear Power Station are briefly introduced.

    youdao

  • 大亚湾核电站第九循环开始换料向18个月换料转换,使得堆芯热工水力设计不再适用

    GNPS begins to implement the 18-month fuel cycles from the initial annual reload at cycle 9, thus the initial core thermal hydraulic design is not valid any more.

    youdao

  • 分别循环长度功率因子卸料燃耗为目标函数,应用遗传算法对大亚湾核电站炉装载进行优化

    The code was employed to optimize the cycle length, the peak power factor and the discharge burnup of the first cycle loading for the Daya Bay Nuclear Plant.

    youdao

  • 大亚湾核电站机组在进入18个月换料之后,原来用程序计算刻度曲线出现了越来越偏差

    As Daya Bay nuclear power station has entered the 18-month fuel cycle, the bias of calibration curve from 1d code is growing larger.

    youdao

  • 采用ME LCOR程序比较大亚湾核电站全厂断电事故下,恢复供电不同喷淋模式事故进程影响

    The effects of different spray models on the accident progress after the power recovery at blackout accident in Daya Bay Nuclear power Plant were compared by MELCOR code.

    youdao

  • 摘要大亚湾核电站岭澳核电站目前共有各种3000其中A SG辅助给水泵系统属于安全设备

    Abstract: Daya bay and ling ao nuclear power plant at present there are various kinds of pump group of more than 3000 units, the ASG auxiliary feed water pump issue belongs to nuclear safety.

    youdao

  • 介绍了主控室报警处理计算机辅助系统设计思想开发环境功能流程以及功能大亚湾核电站主控室实施应用情况

    The design ideology, exploring environment, the function flowing of the real time alarm process computer aided system and it 's application in Daya Bay Nuclear Power Station are introduced.

    youdao

  • 全面回顾大亚湾核电站培训体系建立过程,重点阐述了具有大亚湾核电站自身特色授权培训制度运行人员培训体系。

    The setup of Daya Bay NPP training system with an emphasis on Daya Bay NPP's authorization training system as well as operational personnel training system is reviewed.

    youdao

  • 依赖专家知识建立了大亚湾核电站秦山第二核电厂换料装载知识库,在基础进行换料堆芯装载方案启发式优化搜索

    The expert knowledge library for Daya Bay and Qinshan phase II NPP has been established based on expert knowledge, and the reload core loading pattern heuristic search is performed with this library.

    youdao

  • 简要回顾了切尔诺贝利核电站事故影响教训,结合广东大亚湾核电站放射性物质排放情况和运行经验,提出有关核电安全建设的建议

    The information of nuclear accident in the Chernotyl power plant was described and the radioactive waste release and the operation experience in GNPS were recommended.

    youdao

  • 大亚湾核电站由年换料改为18月换料,燃料组件AF A2g改为afa3g,堆中子学参数发生了较大变化因此需要许多事故重新进行分析。

    The reload strategy is from 12 months to 18 month of GNPS, the fuel assembly changed from AFA 2g to AFA 3g and core nuclear data been changed, thus many accidents need to be reanalyzed.

    youdao

  • 作为核能制造技术方案提供者我们正在致力于中国发电事业:我们向大亚湾岭澳核电站提供了核能反应堆

    As a provider of solution to produce nuclear energy, we are contributing to generate electricity in China: we have supplied nuclear power reactors in Daya-Bay and Ling-Ao.

    youdao

  • 介绍大亚湾秦山一期核电站蒸汽发生器清洗前、目视检查

    It describes the visual inspection generator of steam con in Daya Bay and Qinshan INPPbefore cleaning and after cleaning.

    youdao

  • 20年前中国第一大型核电站大亚湾工程以后阿尔斯通CGNPC东方电气工业合作伙伴

    Alstom has been CGNPC's and Dong Fang's industrial partner, since the construction of Daya Bay, the first large Chinese nuclear power plant, 20 years ago.

    youdao

  • 20年前中国第一大型核电站大亚湾工程以后阿尔斯通CGNPC东方电气工业合作伙伴

    Alstom has been CGNPC's and Dong Fang's industrial partner, since the construction of Daya Bay, the first large Chinese nuclear power plant, 20 years ago.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定