• 填土渗漏可能污染地下水地面水

    Seepage from land fills can pollute ground water or surface.

    youdao

  • 模型能够反映填土施工应力路径影响

    This constructive model can reflect the influence of stress path in fill construction.

    youdao

  • 补充可以采矿时将石头的石头填土

    Added: You can craft Destroyed Stone to backfill holes while mining.

    youdao

  • 他们盆栽

    Fill them with potting soil.

    youdao

  • 对压填土工程应用时控制标准提出了建议

    Some suggestions about the controlling standard of the compacted fill are proposed.

    youdao

  • 治愈伤痕受伤会吃掉你的填土,你饿了

    Heal your wounds, you wounded, and eat your fill, you hungry.

    youdao

  • 又逼另外十四个人条沟里然后活埋。

    Fourteen others, he forced to lie down in a ditch, then he covered them with earth.

    youdao

  • 工作包括某些地方要挖、在一些地方要

    This involves cutting away the earth in some places and building it up in the others.

    youdao

  • 皂化粉煤灰可以用做桥头等高填土路段材料。

    Saponification slag-fly ash can be used in the high fill sections of highway.

    youdao

  • 十一个填土形成。下列四个岛中哪个不在其中

    Eleven islands are being reclaimed to form Jurong island. Which of these four is not one of them?

    youdao

  • 室内试验填土含水量测定、颗粒分析比重测定

    Laboratory fill test: fill water content, grain analysis and specific gravity test were tested.

    youdao

  • 公路路基构筑物天然基和人工两大部分。

    Highway subgrade is soil body structure including natural earth foundation and artificial fill embankment.

    youdao

  • 直到看到放进地里,上面了,我开始觉得有点像是真的

    It wasn't until I saw it being lowered into the earth, and mud being thrown on top, that I began to feel a little bit like it was real.

    youdao

  • 实践证明技术新近中的应用可行的,加固效果显著。

    The practice proved that it is feasible for this technology to be used in newly filled earth foundation.

    youdao

  • 玲玲弓着手里拿着正在一锹地给小树苗呢!

    Lingling around his waist, bow with the foot, holding a small shovel, is a spade a spade to saplings fill!

    youdao

  • 上海青平高速公路施工期间发生桥台横向位移引道填土滑坡情况。

    Transverse displacement of bridge abutment and fill slide of approach happened during the construction period of Shanghai Huqingping Freeway.

    youdao

  • 山区发电工程建设工程许多项目涉及碎石边坡地基问题。

    In power project construction in mountainous areas, many are concerned of gravel backfill soil slopes and treatments.

    youdao

  • 路堤、台背路堤加筋、岩石边坡路基防护路面裂缝防治

    For example, it can apply to embankment reinforcement and embankment fill and rock slope defence and pavement crack prevention etc.

    youdao

  • 还要考虑可能备选方案比如是选择混凝重力坝还是选择填土筑堤大坝

    It also includes a consideration of possible alternatives, such as a concrete gravity dam or an earth-fill embankment dam.

    youdao

  • 城区建筑地基上部广泛赋存以炉灰渣为主要成分,其厚度不一。

    On the upper part of foundation in the ancient city, there is a large number of miscellaneous fill which is mainly composed of stove ashes and is variable in thickness.

    youdao

  • 面层外观凹凸不平,材质疏松柔韧,留有90%以上的空间可沙粒

    The surface is uneven and crumbly, so it allows soil or sand be filled in by 90%.

    youdao

  • 填土路堤具有一系列缺点所以高速公路进行路堤设计一种必然趋势

    The high earth filled embankment possesses a series of demerits, so the freeway low embankment design is an inexorable trend.

    youdao

  • 填土路堤具有一系列缺点所以高速公路进行路堤设计一种必然趋势

    The high earth filled embankment possesses a series of demerits, so the freeway low embankment design is an inexorable trend.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定