-
在这个控制方案中,HP塔的塔顶压力的控制通过调节LP塔进料量来实现。
The top pressure of HP column was controlled by adjusting the feed flow rate to LP, FLP.
youdao
-
在这个控制方案中,HP塔的塔顶压力的控制通过调节LP塔进料量来实现。
The top pressure of HP column was controlled by adjusting the feed flow rate to LP, FLP.
youdao