• 这些方面任何如果认为需要要求某一项目的任何阶段进行评价

    Any of these parties may call for evaluation at any stage of a project if deemed necessary.

    youdao

  • 关于扩展最佳就是项目早期阶段,利用新的代码模式进行原型设计试验

    The best use case I have found for extending Lombok is prototyping and experimenting with new code patterns at the early stages of a project.

    youdao

  • 当然可以项目进行之中结合测试,测试通常不是所有编码工作结束后才开始而是一般稍后阶段进行测试。

    Sure, there may be integration testing while the project is going on, and testing doesn't usually start after all the coding is done, but it's usually in a later phase.

    youdao

  • 项目早期阶段(设计阶段),可能每天进行操作。

    This will probably occur daily in the early stages of the project, that is, in the design phase.

    youdao

  • 成功的进行设计检查创建项目计划显示如何计划过渡第2阶段

    Creating a project plan to show how we proposed making the transition to Phase 2 after a successful design review.

    youdao

  • 可以加入ProjectZero社区参与项目工作加入论坛,您可以论坛中对项目每个开发阶段进行评论

    You can join the Project Zero community, contribute to the project, or join the discussion forum, where you can comment on the project through each stage of its development.

    youdao

  • 公司价值工程研究项目一般设计阶段进行

    The value of the company's engineering research projects are usually carried out at the design stage.

    youdao

  • 风险项目终结阶段,风险投资公司决定撤出风险资金选择相应的退出渠道,进行风险项目最终评价

    During the terminating period of risk projects, a risk investment company will choose a proper receding way to withdraw its risk investment and conduct the final evaluation on the risk project.

    youdao

  • 这使得相同价值资产不同时期了不同价格阶段项目建成项目的资产进行估价

    Therefore the identical value assets will get different prices in different stages, the evaluation of assets will be needed for projects building or having built.

    youdao

  • 摘要施工项目管理全过程中,为了取得阶段目标最终目标实现进行各项活动中,必须加强管理工作。

    Abstract: in the construction project management in the whole process, in order to obtain the phase object and realize the final goal, in various activities, we must strengthen the management work.

    youdao

  • 介绍了目前国内外工程公司石油化工装置设计阶段项目进行卫生安全环保(HSE)控制现状找出了差距。

    The status quo of health, safety and environment (HSE) control in design of petrochemical units in both foreign and domestic engineering corporations were introduced and the backwards pointed out.

    youdao

  • 控制阶段主要大型体育赛事项目成本风险进行分析

    In the control stage, the analysis is mainly carried on to the cost and the risk of large-scale sports event.

    youdao

  • 项目执行阶段我们更有专业人员进行项目全程跟踪服务实现完美品质最后一关。

    During the project implementation stage, our professionals will perform full course trace services, holding the last pass for perfect quality.

    youdao

  • 本文通过对建设项目环境污染原因进行分析提出项目不同阶段解决建设项目环境污染的一些见解方法

    The present paper analyzes the causes and puts forward several methods to solve the problem in the different stages of construction.

    youdao

  • 经济可行性方面按照项目特点市场表现阶段进行了推进和分析。

    Regarding economical feasibility, as per project's characteristic and market performing, there are three stages to be analyzed step by step.

    youdao

  • 论述我国铁路建设项目管理体制现状不足基础,针对铁路建设项目管理中业主地位项目前期规划阶段重要性进行了进一步分析。

    Based on the discussion of system present state and shortage for national railway construction project, building owner 'position and importance of project prior planning were analyzed.

    youdao

  • 设计监理设计阶段对设计项目进行监理,主要目的确保设计质量时间目标满足业主要求

    Designing phase is to design projects in the design stage of supervision, its main purpose is to ensure that the design quality and time goal meet the requirement of owner.

    youdao

  • 实施阶段针对产品实现过程中的“短板”环节,成立了项目成熟工艺的条件下,进行工艺攻关。

    During the doing phase, the project office tackle the key problem which is no any mature process.

    youdao

  • 项目起始阶段术语表尽可能进行了修正

    These have been corrected to the extent possible during the Inception Phase of the Project.

    youdao

  • 关于bc),需求过程技术方面不可预见变更可能会要求承包方去升级用于对应阶段测量集并项目经理进行沟通

    Regarding (b) and (c), unforeseeablechanges in requirements, process, or technology may require the contractor toupdate the set of measures used for that phase and communicate this to the PM.

    youdao

  • 关于bc),需求过程技术方面不可预见变更可能会要求承包方去升级用于对应阶段测量集并项目经理进行沟通

    Regarding (b) and (c), unforeseeablechanges in requirements, process, or technology may require the contractor toupdate the set of measures used for that phase and communicate this to the PM.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定