• 试验研究表明:源、水泥水量是影响水泥特性最主要因素。

    The optimum mixing quantity of cement, water-solid ratio and quantity of additives of cement-soil slurry satisfying the space-filling effects are put forward after this research.

    youdao

  • 采用陶瓷进行创作,原因陶瓷能够表达思想

    I work with porcelain paper clay as it is the form of expression that best encapsulates my concepts.

    youdao

  • 加筋干垒块西方比较流行一种结构形式,传统钢筋混凝砌片石挡墙相比,其外形美观、施工便捷且降低整体造价

    Reinforced segmental retaining wall, a wall structure popular in western countries, is of good appearance, easy construction and low cost in comparison with the traditional RC or stone retaining wall.

    youdao

  • 钻孔钻孔灌注桩后压技术在施工工艺不同荷载传递性状有差异

    The construction process of drilling and fluid compress pile and that of drilling and grouting pile are different, so the load transfer behaviours between pile and soil are also varied.

    youdao

  • 研究采用方法实现秧盘连续机理设计了装置

    A principle to realize the rice seeding tray successive coverage mud using the mud bedding method is studied. A device of mud bedding is designed.

    youdao

  • 软弱地基结合形成复合地基,提高桩端承载力

    Cement paste with the weak foundation soil combine to form a composite foundation, can improve pile bearing capacity.

    youdao

  • 论文主要开展以下几个方面工作1研究囊袋扩孔钉新技术

    Thesis work carried out in the following areas:1. Study the new slurry grouting pocket reaming soil nail technology.

    youdao

  • 有机蒙脱沥青胶疲劳性能改善作用应力应力更加明显。

    Moreover, the improvement effect of silicate on fatigue of bitumen is better at higher stress than at lower stress ratio.

    youdao

  • 灌注桩后压技术解决沉淤桩身影响灌注桩承载力问题,使桩底、桩侧得到了加固,从而大幅度提高灌注桩的承载力,降低了桩的沉降量。

    Problem on the bearing capacity of cast-in-place pile influenced by the deposit at pile end and the mud hanged on pile shaft can be solved by the technique with the post grouting.

    youdao

  • 施工方法,采用专用设备混 凝桥面板表面进行、拉毛或凿毛、清扫、吹净处理;

    Its synchronous construction process includes milling and planing the concrete bridge surface to roughen, cleaning and blasting with special apparatus;

    youdao

  • 施工方法,采用专用设备混 凝桥面板表面进行、拉毛或凿毛、清扫、吹净处理;

    Its synchronous construction process includes milling and planing the concrete bridge surface to roughen, cleaning and blasting with special apparatus;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定