土地前期开发要引入市场机制,按照有关规定,通过公开招标方式选择实施单位。
Market mechanism shall be introduced in pre-development of land. The construction unit shall be selected by public call for bids according to relevant regulations.
另外对于当地农民进行土地使用权的前期补偿非常廉价:通常只有几个月的收入就可以换取100年的租期。
And upfront compensation to local farmers for use of their land is derisory: often just a few months of income for agreeing to a 100-year lease.
值得注意的是,不止一次考古证实关于这个符号在公元前期间以色列的土地上被使用。
Notably, not a single archaeological proof exists concerning the use of this symbol in the Land of Israel during BCE.
房地产前期的成本控制大致包括土地成本控制阶段、投资决策阶段以及规划设计阶段。
The cost control of real estate in earlier stage broadly includes the stage of controlling land cost, the stage of investment and decision-making and the stage of plan and design.
本研究为河南省土地利用总体规划修编、耕地占补平衡目标实现提供前期研究。
The study is an earlier stage job for integrated land-use planning and cropland held-replenish balance in Henan province.
以前人们都算错了一本账:在前期分析时都把土地使用的改变忽略不计了。
Previously there's been an accounting error: land use change has been left out of prior analysis.
计算表明,预压结构性软土地基在加载填筑前期也很有可能会失稳破坏。
The example shows that the structural soft clay ground maybe destroys during the preceding loading.
项目前期工作进展情况:已完成可行性报告及论证,项目总体规划正在申报中,土地已选定。
V. Preliminary work: the feasibility report and demonstration have been completed, overall planning of the Project is under declaration, and land has been selected.
船营经济开发区可提供土地、水、电和项目建设的前期手续。
Chuanying economic development district could provide land, water, electric and the prophase procedure of project construction.
城市土地供给计划的制订不仅要考虑前期土地供给对本期土地供给的影响,也要考虑本期土地供给对后期土地供给的影响。
And lastly the establishment of urban land supply plan not only needs to give consideration for current impact by the earlier land supply, but also the current effects on the future land supply.
但是管道的建设期是在管道定线,土地使用权限和环境评估通过之后才能进行,并且大多数的管道施工的前期工作都已经完成了。
But the construction phase can only begin after route selection, easement negotiations, environmental permitting, and many other pre-construction actions have been accomplished.
但是管道的建设期是在管道定线,土地使用权限和环境评估通过之后才能进行,并且大多数的管道施工的前期工作都已经完成了。
But the construction phase can only begin after route selection, easement negotiations, environmental permitting, and many other pre-construction actions have been accomplished.
应用推荐