• 锅炉回转式空气预热器发生二次燃烧主要原因燃烧不稳定内部漏油蒸汽压力不够相关

    The main reasons to the rotary air pre-heater secondary combustion are related to unstable oil gun combustion, internal oil leakage and insufficient soot-blower steam pressure, etc.

    youdao

  • 系统过热蒸汽配合工作。蒸汽来自买方流量计过热出口下游管道

    The sootblower system shall operate with superheated steam. The steam shall be taken from the superheater outlet piping down-stream of the Purchaser's flow element.

    youdao

  • 将要介绍的这些方法为:增加黑液固形物含量空气预热系统、给水预热、蒸汽参数电除尘回收

    The methods to be presented are: increased dry solids content of black liquor, air preheating, soot blowing arrangement, feedwater preheating, steam parameters and heat recovery after precipitator.

    youdao

  • 锅炉蒸汽吹灰保持受热面清洁较高锅炉效率有效手段

    The boiler steamsootblowing is an effective way to keep the heatabsorbing surface clean and higher boiler efficiency.

    youdao

  • 本文将要介绍方法为:增加黑液固含量空气预热系统、给水预热、蒸汽参数电除尘回收

    The methods to be presented are: increased dry solids content of black liquor, air preheating, soot blowing arrangement, feed water preheating, steam parameters and heat recovery after precipitator.

    youdao

  • 介绍了可编程控制器新型蒸汽巡扫吹灰装置中的应用与改进

    Improvement of PLC control system on new steam soot-blower in heat pipe preheater is introduced.

    youdao

  • 介绍了可编程控制器c 200h热管空气预热新型蒸汽巡扫吹灰系统中的应用情况。

    Application of PLC C200H on new steam soot-blower in heat pipe pre-heater is introduced.

    youdao

  • 介绍了新型蒸汽巡扫吹灰工作原理特点应用情况。

    A new type of steam soot-blower applied on heat pipe preheater is introduced, including its working principle and features.

    youdao

  • 由于蒸汽存在较多缺点,广州石油化工总厂动力厂采用了WS-10型声波吹灰取代原来蒸汽吹灰器,实现了维护

    In view of the defects of steam soot-blowers, WS-10 type maintenance free sonic soot-blowers are used to replace the original steam ones in the Power Plant of Guangzhou Petrochemical General Works.

    youdao

  • 由于蒸汽存在较多缺点,广州石油化工总厂动力厂采用了WS-10型声波吹灰取代原来蒸汽吹灰器,实现了维护

    In view of the defects of steam soot-blowers, WS-10 type maintenance free sonic soot-blowers are used to replace the original steam ones in the Power Plant of Guangzhou Petrochemical General Works.