针对此现状,提出了一种负荷率偏差法,用于解决直调火力发电单元月度电能交易计划编制问题。
For this status, this paper proposes a new load ratio deflection method for making monthly trade schedule of directly dispatched thermal power generation units.
依据负荷曲线的变化趋势,提出了一种能够细致考虑负荷变化率的日发电计划安排方法。
A daily generation scheduling method which can carefully consider the load variation rate is presented.
本文分析了当前我国电力供需紧张的主要原因,电网负荷率降低使得可发电量有余、可供电力不足。
The decrease in load rate of network has caused the amount of power generated cannot be totally transmitted.
机组爬坡率(即机组的升、降负荷能力)是火电机组正常运行的一个重要参数,因此,在编制火电系统日发电计划时必须充分考虑火电机组的爬坡率约束。
Unit ramp rate is a very important parameter for unit running, so it must be seriously concerned when dis-patching unit schedule for thermal power system.
机组爬坡率(即机组的升、降负荷能力)是火电机组正常运行的一个重要参数,因此,在编制火电系统日发电计划时必须充分考虑火电机组的爬坡率约束。
Unit ramp rate is a very important parameter for unit running, so it must be seriously concerned when dis-patching unit schedule for thermal power system.