当检修柴油发电机时,你可用这些工具。
You can use these tools when overhauling the diesel-generators.
发电机每半年应检修一次。
Generators should go for check and overhauls every half a year.
阐述了汽车交流发电机故障的诊断、检修及测试的全过程。
This paper expounds the whole course of the diagnosing, overhauling and testing of the auto alternator.
介绍T815-2型自卸车交流发电机原理,DLR-2P28V型电压调节器电路分析与常见故障检修。
This paper introduces the alternator principle of TATRA T815-2 dumper, the circuit analysis of DLR-2P28V voltage regulator and its common trouble shooting.
根据机车主发电机绕组测试检修的技术要求,结合单片机技术,开发出机车主发电机直流电阻测试仪。
The DC resistance tester is designed, by combining the technical requirements of the locomotive power generators winding test and Microcontroller technology.
发电机组检修直接影响电网的发电出力和运行方式,对电力系统运行的可靠性和经济性都有很大的影响。
Because of the direct influence on the firm output and operating, the generator maintenance scheduling affects the reliability and the economic operating of power system significantly.
为避免发电机组“检修过剩”或“检修不足”现象的发生,提出了基于马尔可夫链状态估计模型的状态检修策略。
To avoid the "over-maintenance" or "under-maintenance" in generator set maintenance decision, a maintenance strategy based on Markov chain state estimation model is presented.
简述了5号发电机转子高速接地故障的查找和检修处理方法。
The searching and repairing methods for high speed grounding accident of rotor winding in generator no. 5 have been briefly described.
在水力发电公司检修时,几次碰到发电机不能启励建压的情况,经过检查分析,最终确定为剩磁的原因,主要是检修后剩磁的极性与转子直流电产生的极性相反造成的。
Checking and analysis revealed at last, that it was caused by residual magnetism after repair, the polarity of which was opposite to that effected by direct current in the rofor.
以烟气连续排放监测系统在焦作电厂燃煤发电机组上的应用为例,介绍了一种加热式直接抽取法烟气连续监测系统的原理,分析了系统组成及功能、系统运行及系统的维护检修。
Based on the application of CEMS to the coal-fired generating unit of Jiaozuo Power Plant, the working principle of a CEMS based on heating type direct extraction is presented.
这种优化方法由相互关联的三部分组成:发电机组的年度检修计划、月和日的运行计划。
This optimization approach consists of three parts: The annual MS, the monthly and the daily operation scheduling of power systems.
这种优化方法由相互关联的三部分组成:发电机组的年度检修计划、月和日的运行计划。
This optimization approach consists of three parts: The annual MS, the monthly and the daily operation scheduling of power systems.
应用推荐