• 随着容量发电使用倘若发电容量作分块处理,使可靠性评估发生误差

    If generator capacity were not graded, the error in reliability evaluation would increase along with the large-capacity generators put into use.

    youdao

  • 目前在求解可用输电容量(atc)容量效益裕度(CBM)的评估根据预先设定的某发电可靠性水平多次计算可靠性,进行迭代优化

    Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.

    youdao

  • 目前在求解可用输电容量(atc)容量效益裕度(CBM)的评估根据预先设定的某发电可靠性水平多次计算可靠性,进行迭代优化

    Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定