随着大容量发电机的使用,倘若发电容量不作分块处理,将使可靠性评估发生误差。
If generator capacity were not graded, the error in reliability evaluation would increase along with the large-capacity generators put into use.
目前在求解可用输电容量(atc)时,容量效益裕度(CBM)的评估是根据预先设定的某一发电可靠性水平多次计算可靠性,进行迭代优化。
Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.
目前在求解可用输电容量(atc)时,容量效益裕度(CBM)的评估是根据预先设定的某一发电可靠性水平多次计算可靠性,进行迭代优化。
Capacity benefit margin (CBM) is evaluated and optimized via an iterative method based on a presumed generation reliability level when the available transfer capability (ATC) is calculated.