并对梯级开发方案中最大的在建电站——双河口水电站进行了较详细的介绍。
And a detailed description has been given to the biggest plant under construction, Shuanghekou plant.
对生态环境需水量的变化进行了对比分析,阐述了双台子河口湿地生态环境需水量变化的原因,为双台子河口湿地保护和水资源合理利用提供有利依据。
That change was explained by comparison and analysis of the data, which could provide a useful basis for conservation and reasonable water resources exploitation of the Shuangtaizi estuarine wetland.
蔺河口水电站大坝为碾压混凝土双曲拱坝。
The Linhekou Hydropower Station has a RCC double-curvature arch dam.
双台子河口及西部来水来沙是东部沙洲和浅滩发育的主导因素。
Water and silt from the Shuangtaizi river and from the area west of the river are the main factors for the shoal development in the eastern part of this area.
双台子河口及西部来水来沙是东部沙洲和浅滩发育的主导因素。
Water and silt from the Shuangtaizi river and from the area west of the river are the main factors for the shoal development in the eastern part of this area.
应用推荐