• 介绍了上海通用汽车有限公司的循环取方式整个路线设计分成建立路线网络、卡车货物装载、卡车安排司机安排。

    Cyclic goods - taking method in Shanghai GM is introduced. The entire route layout is divided into route network, 3 - dimensional track loading, truck arrangement and driver arrangement.

    youdao

  • 本文介绍了上海通用汽车的建设成果包括工厂建设、设备安装国产化配套员工培训各项工作产品发展前景

    The construction achievements and product developing prospects are introduced including plant construction, equipment installation, localization supply, staff training and other items.

    youdao

  • 本文介绍了上海通用汽车的建设成果包括工厂建设、设备安装国产化配套员工培训各项工作产品发展前景

    The construction achievements and product developing prospects are introduced including plant construction, equipment installation, localization supply, staff training and other items.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定