[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
应用推荐