从工程项目动态优化管理的思想出发,提出了一种广义的工程项目控制系统的优化方法。
A generalized optimization method of engineering projects control system is given which carries out the idea of dynamic optimization management.
指出在复杂大系统工程项目计划中,利用网络计划技术进行动态优化管理与决策是工程项目计划管理与决策的一种有效途径。
And it is considered a effective approach to apply dynamic optimization management and decision with network schedule technique in complex large system project schedule.
应用服务器供应商在其内存空间实现池管理器,并根据需要动态改变池的大小,从而优化资源的使用。
The application service provider implements the pool manager in its memory space and can optimize resource usage by dynamically altering the pool size, based on demand.
针对网络化制造环境下供应链需求不确定的特点,采用模型预测控制技术解决供应链管理中库存的动态优化问题。
Model predictive control was applied to solve the dynamic optimization problems of the inventory in supply chain management for the demand uncertainty of supply chain under networked manufacturing.
顾客价值管理是指对客户群对于公司终生的价值不断的动态优化。
Customer value Management is the ongoing dynamic optimization of the value of a portfolio of customers throughout their lifetime with your company.
通过一个临时性的专门的柔性组织,对项目进行高效率的动态管理和项目目标的综合协调与优化。
That is to efficiently and dynamically administer the project, and synthetically coordinate and optimize project by a temporal and flexible organization specialized.
通过计算机系统建立甘蔗生产模型从而快速掌握甘蔗的糖分动态,对优化管理甘蔗生产具有现实意义。
It has practical significance for optimal management of sugarcane production to quickly master the dynamics of sugar content through establishing production mod el of sugarcane with computer system.
本项研究有利于促进和深化建模与模型管理的类人化、智能化研究,在动态系统的实时优化控制领域具有较广阔的应用前景。
Modeling and model management have been further studied with anthropoid and intellectualization, and will be used widely in real time optimal control of dynamic system.
第三,集中重点描述了随机动态规划在资产负债管理中的应用,包括基本概念、完整的优化模型及应用的步骤等。
Following, it describes in detail of the dynamic stochastic programming model used in asset liability management, consisting of the basic concepts, optimizing model and the steps.
成功的风险管理是在均值回归的哲学指导下通过资产配置的动态优化实现的。
Under the guidance of the philosophy of the mean - reversion, we are able to achieve risk management successfully through dynamic asset allocation.
根据网络动态信息安全管理的需求,提出了协调代理的方案选择优化数学模型。
The Scheme Choice Optimization Model was expounded based on coordinating agent to meet the need of dynamic network information security management.
针对供应链网络需求不确定的特点,采用模型预测控制技术解决供应链管理中库存的动态优化问题。
Model predictive control is applied to solve dynamic optimization of the inventory in supply chain management according to the demand uncertainty.
针对三维可视化的特点,本文分析了该集成机制的性能优化方法,并讨论了基于三维对象的动态缓冲管理技术。
According to characteristics of 3d visualization, we analyze some methods for optimal performance and discuss dynamic buffer management technique on 3d object.
针对网络化制造环境下动态供应链管理特点,利用分布式模型预测控制技术解决供应链中动态优化控制问题。
Aiming at characteristics of dynamic supply chain management under networked manufacturing, distributed model predictive control was applied to solve dynamic optimization control in supply chain.
动态优化控制管理法是从实践中提炼出来的理论方法,并又在实践中得以证明,取得良好成效。
The method of dynamic optimizing control management is the academic method of management that abstract from practice, it is proved in practice, and it has acquired favorable effect.
动态交通管理的优化帮助交通管理者针对实时交通状况制定出最优的交通管理方案。
Optimization for dynamic transport management are helpful for traffic operators to set up optimum traffic management plans, with respect to real time traffic conditions.
发电厂动态成本分析是以优化发电厂生产管理与控制发电成本为目的。
For the purpose of optimizing the production management of power plant and controlling the generating cost, the dynamic cost analysis system for power plant is proposed.
在提出的模型中,算法PBIL的结果及分析充分显示了模型在资源管理中的适用性,以及基于种群的优化技术在动态价格中的应用能力。
Promising results and analysis are obtained from PBIL confirming its suitability for resource management in the proposed model and applicability of popul…
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;