注意,在降低功率的模式下的值的选择必须使得设施在生产开始之前的规定时间内(时间计划结合在其中)达到GMP符合状态。
Note that the values in reduction mode have tobe chosen in such a way that the facility has reached the GMP-compliant statein due time before production begins (integration of a time program).
注意,在降低功率的模式下的值的选择必须使得设施在生产开始之前的规定时间内(时间计划结合在其中)达到GMP符合状态。
Note that the values in reduction mode have tobe chosen in such a way that the facility has reached the GMP-compliant statein due time before production begins (integration of a time program).
应用推荐