养护时间不同,其抗压强度有明显的差异。
早期强度高、脱模、养护时间短、施工期大大缩短。
The early high strength and can separate mould, nursing in short time, shorten forming time.
探讨了养护温度、养护时间和环境湿度对坯体性能的影响。
The influences of cure temperature, cure time and ambient humidity on the properties of the dam blank were discussed.
结果表明:提高养护温度可以提高粉煤灰基矿物聚合物的抗压强度,缩短养护时间。
The results showed that the increasing of curing temperature could improve the compressive strength and shorten the curing time of fly ash based mineral polymer.
保证墙体有足够的养护时间(4~8周),并充分干燥,除去表面的灰浆渣和任何松动物质。
To ensure the conservation of the wall have enough time (4 to 8 weeks), and fully dry, remove surface residue and any loose mortar material.
随养护时间的延长,水泥石低压应力下的弹性形变恢复能力和高压应力下的塑性形变能力均降低;
When curing time increasing, cement stone's elasticity deformation restorability in low stress and plasticity deformation capacity in high stress decreased.
在实验的基础上通过对恒温温度及养护时间对粉煤灰强度影响的分析,得出粉煤灰制品的最佳养护温度和时间。
On the basis of experiments and analysing the effects of the constant temperature and curing time on the strength of fly-ash, the best curing temperature and time are obtained.
研究了模内养护时间对低水泥刚玉质浇注料强度及其他性能的影响,探讨了施工过程中缩短浇注料模内养护时间的可行性。
This work studies the effect of curing time in mold on the strength and other properties of low cement corundum castables, exploring the feasibility of reducing the curing time in mold.
水泥刨花板卸出压机后的自然养护时间对快速固化水泥刨花板物理力学性能的影响主要取决于板在养护期间水泥的水化情况。
The natural curing time of CPB after hot pressing on the physical and mechanical properties of fast-curing CPB were determined by the hydration of cement.
但在过去十年里,养护不良已经导致故障、过度拥挤和长时间误点。
But in the last decade, poor maintenance has led to breakdowns, overcrowding and lengthy delays.
正常情况下这是养护的截止时间。
探讨了受火温度、高温后静置时间及冷却和养护方式对火灾高温后混凝土抗压强度的影响。
The effects of high temperature, standing time after cooling, methods of cooling and curing on the compressive strength of concrete are discussed.
时间t时的抗压强度与水泥种类,温度以及养护条件有关。
The compressive strength of concrete at an age t depends on the type of cement, temperature and curing conditions.
研究了养护温度、时间及泌水率对灌浆材料结冰压的影响。
The effects of curing time, temperature and bleeding capacity on ice-formation pressure of grout were studied.
我们不愿意华大量的时间来从事隐形的养护工作。
We don't want to spend a lot of time maintaining low-observable treatments.
中涂层养护硬化时间约为8小时以上;
The curing time of the mid-coat should be more than 8 hours.
标准养护的时间分别为0天,2天,6天和27天,试验龄期均为28天。
Standard curing periods were respectively 0, 2, 6, 27days, trial age was 28 days.
标准养护的时间分别为0天,2天,6天和27天,试验龄期均为28天。
Standard curing periods were respectively 0,2,6,27days, trial age was 28 days.
混凝土养护措施不当或时间不足。
Concrete maintenance measures are incorrect or maintenance time insufficient.
此外,长时间的风吹日晒及反复“日光浴”对老年人的皮肤养护有损无益,应尽可能避免。
In addition, the prolonged and repeated wind and sun, "sun" on the skin and conservation to the detriment of older persons, should be avoided.
试验结果表明,CFRM应变传感器的电阻在养护初期增长迅速,然后逐渐变慢,养护结束后很长一段时间内持续呈线性增长;
Results show that:the resistance of CFRM strain sensors grows rapidly at the beginning of curing age, and then slows down.
试验结果表明,CFRM应变传感器的电阻在养护初期增长迅速,然后逐渐变慢,养护结束后很长一段时间内持续呈线性增长;
Results show that:the resistance of CFRM strain sensors grows rapidly at the beginning of curing age, and then slows down.
应用推荐