• 有关建筑工程安全国家标准不能适应确保建筑安全要求时,应当及时修订

    The state safety standards on construction projects which can not ensure the safety of buildings shall be amended without delay.

    youdao

  • 所有上述修订文件架集团工程总监(PSG)技术总监批核

    All such revisions will be approved by the PSG Engineering or Technical Director.

    youdao

  • 或者顾客最新修订图纸不够细化,或者前后矛盾需要钣金厂工程花费额外作图时间来进行整理,而顾客却不会为此付出买单。

    Or the customer's latest revisions have bad drawings with open geometries and other inconsistencies, and hence require unplanned hours at the engineer's desk-hours the customer isn't paying for.

    youdao

  • 生产文件修订工作生产工程部(PED)负责控制

    Revisions to manufacturing documents will be controlled by the PED department.

    youdao

  • 有关建筑工程安全国家标准不能适应确保建筑安全要求应当及时修订

    When State standards for construction safety fail to meet the requirements for ensuring such safety, they shall be revised without delay.

    youdao

  • 其次工程修订大规模性能阻尼设置

    Next, the engineers revised the damping settings for the massive fork tubes for even better performance.

    youdao

  • 本文主要介绍混凝土结构工程施工验收规范修订情况及主要修改内容

    This paper introduces the revision and main revised contents of the national code for construction and acceptance of concrete building structures.

    youdao

  • 砌体工程施工质量验收规范根据建设部要求修订的,共设正文11137附录2个,强制性条文14条。

    The Acceptance Test Standard of Masonry Works is revised in accordance with request of the Construction Ministry including 11 chapters with 137 items, 2 appendix and 14 compulsory provisions.

    youdao

  • 讨论有关标准规定、理解差异设计习惯等问题对此结构造价影响标准修订工程建设有一定的参考价值

    The effects of difference of the standard and design idiom on the structure cheapness were discussed. It will be useful to standard revisal and project construction.

    youdao

  • 方法应用工程项目建设工期定额修订完善以及建设工期定额的执行和建设工期决策管理

    This method may use in revision and perfection of quota in completion time of project, and use in the decision and management of completion time of project.

    youdao

  • 扬州大学工程管理专业于1999年创办,教学计划经过二轮修订

    It had set up the project management specialty of yangzhou university in 1999, teaching plan had emended by second-time.

    youdao

  • 方法应用工程项目建设工期定额修订完善以及建设工期定额的执行和建设工期决策与管理。

    This method may use in revision and perfection of quota in completion time of project, and use in the decision and management of completion time of...

    youdao

  • 修订21世纪服装设计工程专业(本科)培养目标就是满足社会对服装相关方面的人才需求。

    To revise the cultivation objects of garment design and engineering specialty (undergraduate course) in 21st century is to meet the social DE.

    youdao

  • 修订21世纪服装设计工程专业本科培养目标就是满足社会对服装相关方面的人才需求。

    To revise the cultivation objects of garment design and engineering specialty (undergraduate course) in 21st century is to meet the social de…

    youdao

  • 收到客户意见检验试验计划(ITP)退还给核质量保证工程(NQAE)评审; 收到意见后,进行修订直到完成客户核准

    Should comments be received from the client, the ITP will be returned to the NQAE for review and after acceptance of the comments, revision until client approval is obtained.

    youdao

  • 本文简单介绍颁布的《疏浚工程测量技术规范中的主要修订内容有关重要补充规定。

    This paper introduces briefly the revised parts and additional articles in the newly issued "Surveying Technical Specification for Dredging work".

    youdao

  • 协助工程客户联系,安排发货,及时追回退件。将客户关于备件技术问题创建入SIS系统

    Be the coordinator with engineers and customers, arrange warranty deliveries and monitor the defectives return. Creating SIS error cases for customer's technical requests of spareparts.

    youdao

  • 试验成果作为今后大厚度自重湿黄土地区工程建设以及黄土规范进一步修订的参考。

    The test results might be useful to similar projects in the area of dead-weight collapse loess with heavy section and to revise "Code for building construction in collapsible loess regions".

    youdao

  • 工程师们没有持续检测修订他们核电站顺利运行预案灾难就降临了。

    He says accidents happen when engineers don't constantly test and revise the assumptions they've made about all the things that a nuclear plant needs to operate.

    youdao

  • 通过解读帮助建筑从业者掌握修订内容实质促进建筑工程质量管理水平提升。

    The paper helps the construction practitioners to improve their understanding about the essence of the "Acceptance Standard" and enhance their ability of managing construction quality.

    youdao

  • [摘要]指出分包合同示范文本修订过程保证修订范本我国现行工程清单计价模式相互协调重点解决三个方面问题,即暂估价项目问题、总承包服务费问题和计日工作问题。

    Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.

    youdao

  • 所得结论可供修订混凝土结构设计规范工程设计参考

    The results may serve a reference for the re- vision of design specifications of concrete structure and i…

    youdao

  • 所得结论可供修订混凝土结构设计规范工程设计参考

    The results may serve a reference for the re- vision of design specifications of concrete structure and i…

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定